现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2019, Vol. 56(2): 40-43    DOI:
Discussion on Causes of and Preventive Measures against Tunnel Lining Voids and Inadequate Thickness
(Engineering Quality Supervision Station, China Railway Chengdu Group Co., Ltd., Chengdu 610031)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn