|
2019, Vol. 56(2): 170-174 DOI: | ||
Study on High Pressure Carbon Dioxide and Geological Alignment of a Tunnel on Xi′ning-Chengdu Railway | ||
(1 China Railway First Survey and Design Institute Group Ltd., Xi′an, 710043; 2 Shaanxi Railway and Underground Traffic Engineering Key Laboratory (FSDI), Xi′an 710043) | ||
Received null Revised null | ||
Supporting info | ||
|