|
2019, Vol. 56(3): 192-199 DOI: | ||
Recycle Application of the Shield Waste Slurry in Backfill Grouting Material: A Case Study of a Slurry Shield Tunnelling in the River-crossing Fuzhou Metro | ||
(1 CCCC Second Harbour Engineering Company Ltd., Wuhan 430040;2 Key Laboratory of Large-Span Bridge Construction Technology, Wuhan 430040;3 Research and Development Center of Transport Industry of Intelligent Manufacturing Technologies of Transport Infrastructure, Wuhan 430040) | ||
Received null Revised null | ||
Supporting info | ||
|