临近端头井盾构开挖引起土体沉降数值分析
(1.广州地铁设计研究院股份有限公司,广州 510010;2.华东交通大学江西省岩土工程基础设施安全与控制重点实验室,南昌 330013;3.华东交通大学江西省地下空间技术开发工程研究中心,南昌 330013)
Numerical Analysis on Ground Settlement Induced by Shield Tunnelling with Adjacent End Shaft Works
(1. Guangzhou Metro Design Institute Co., Ltd., Guangzhou 510010; 2. Jiangxi Key Laboratory of Geotechnical Infrastructure Safety and Control, East China Jiaotong University, Nanchang 330013; 3. Jiangxi Research Center for Underground Space Technology Development and Engineering, East China Jiaotong University, Nanchang 330013)
Download: PDF (3465KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章以南昌地铁2号线雅苑路站施工为例,基于小应变硬化土体(HSS)本构模型,建立从端头井始发的双线盾构隧道掘进模型,分析了基坑开挖与双线盾构掘进共同作用下的土体沉降规律。结果表明:(1)加固盾构始发区土体可有效减弱区域范围内地表沉降,该区域内地表沉降量远小于区间隧道沉降量;(2)在同一埋深条件下,先建隧道地表沉降最大值高于后建隧道地表沉降最大值,地表横向沉降槽呈现非对称W型;(3)基坑开挖与盾构掘进共同作用下引起的地表沉降值,可以由二者单独作用产生的沉降值叠加计算得到。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王 凌 1 钟久强 2
3 朱碧堂 2
3
关键词土体沉降   端头井   HSS模型   双线隧道   盾构开挖     
Abstract: Taking the construction of Yayuan Road Station of Nanchang Metro Line 2 as an example, this paper es? tablishes a numerical simulation model of double-line shield tunnelling starting from the end shaft based on the HSS (Hardening Soil model with Small Strain) constitutive model, and analyzes the ground settlement law under the interaction of foundation pit excavation and double-line shield tunnelling. The results show that: (1) ground reinforcing in the shield launching area can effectively reduce the ground settlement within the area, and the magnitude of ground settlement in the area is much smaller than that in the running tunnel section; (2) under the same buried depth condition, the maximum ground settlement value of previously excavated tunnel is higher than that of subsequently excavated tunnel, and the transverse ground settlement trough shows an asymmetric‘W’shape; (3) the ground settlement caused by the interaction of foundation pit excavation and shield tunnelling can be calculated by superposition of the settlement values induced by construction of the two works separately.
KeywordsGround settlement,   End shafts,   HSS model,   Double-line tunnel,   Shield tunnelling     
收稿日期: 2021-07-06;
基金资助:国家自然科学基金项目(41972291).
作者简介: 王 凌(1980-),男,硕士,高级工程师,主要从事城市轨道交通结构设计方面的研究工作,E-mail: 283084255@qq.com. 通讯作者:朱碧堂(1974-),男,博士,教授,主要从事隧道与地下工程方面的教学研究工作,E-mail:btangzh@hotmail.com.
引用本文:   
王 凌 1 钟久强 2, 3 朱碧堂 2, 3 .临近端头井盾构开挖引起土体沉降数值分析[J]  现代隧道技术, 2022,V59(1): 124-132
WANG Ling1 ZHONG Jiuqiang2, 3 ZHU Bitang2, 3 .Numerical Analysis on Ground Settlement Induced by Shield Tunnelling with Adjacent End Shaft Works[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(1): 124-132