[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2014, Vol. 51 Issue (2) :63-69    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
近距离双线平行盾构施工引起的土体沉降计算
(1义乌工商职业技术学院,义乌 322000; 2浙江大学城市学院土木工程系,杭州 310015)
The Calculation of Soil Settlement Induced by Construction of Twin Parallel Shield Tunnels with a Small-Interval
(1 Yiwu Industrial and Commercial College, Yiwu 322000; 2 Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  文章提出近距离双线水平平行盾构施工引起的总的土体沉降曲线符合正态分布规律,并对现有双线平行盾构施工引起的地面沉降计算方法进行了综述。针对现有各种方法存在的不足,建立了修正的二维Peck公式,可以计算双线平行盾构施工引起的深层土体沉降,同时能够考虑沉降曲线的不对称性。对计算参数取值进行研究,实测数据统计结果表明i总 /i先跟h/D成明显的线性减小关系,提出了参数i■和η■的计算公式。首次提出两条隧道轴线的相对水平距离系数C=L/(h+R),认为总的地面沉降曲线形状与C值大小有关,本文公式适用于C<0.6的工况。算例分析结果表明:本文方法预测值与实测值比较吻合,且计算比较简便。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
吴华君1
纲2
关键词双线平行盾构施工   土体沉降   计算方法     
Abstract: This paper presents that the curve of soil settlement induced by small-interval double-bore parallel shield tunnel construction conforms with the normal distribution, and summarizes the calculation method for surface settlement. Aiming at the deficiencies of various calculation methods, the modified 2D Peck formula is established to calculate the deep soil settlement while considering the asymmetry of the settlement curve. Based on the research of calculation parameters, the measured results show that iTotal / iAdvancing tunnel (i: width coefficient of the settlement trough) decreases linearly with the increase of h/D, thus giving the formula for iTotal and ηTotal (η : Soil loss rate). Additionally, this paper firstly proposes the coefficient C of relative horizontal distance between two tunnel axes (C<0.6; C=L/(h+R)), to which the shape of the total ground settlement curve is related. According to the case study, the predicted values agree with the measured ones and the calculation is relatively simple.
KeywordsDouble-bore parallel shield tunnel construction,   Soil settlement,   Calculation method     
出版日期: 2013-07-16
基金资助:基金项目:国家自然科学基金资助(项目批准号:51078332);浙江省自然科学基金资助项目(Z1100016).
作者简介: 作者简介: 吴华君(1974-),男,硕士,副教授,主要从事地下工程施工与管理方面的研究工作,E-mail: 710028586@qq.com
引用本文:   
吴华君1, 魏, 纲2 .近距离双线平行盾构施工引起的土体沉降计算[J]  现代隧道技术, 2014,V51(2): 63-69
WU Hua-Jun-1, Wei, GANG 2 .The Calculation of Soil Settlement Induced by Construction of Twin Parallel Shield Tunnels with a Small-Interval[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(2): 63-69
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2014/V51/I2/63
 
没有本文参考文献
Copyright 2010 by 现代隧道技术