[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2020, Vol. 57 Issue (5) :84-90    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
基于Hoek-Brown准则的隧道围岩抗力系数计算方法及工程应用
(1西南交通大学土木工程学院,成都 610031;2 西南交通大学交通隧道工程教育部重点实验室,成都 610031;3 四川省公路规划勘察设计研究院有限公司,成都 610041)
Hoek-Brown Criterion Based Calculation Method of Rock Resistant Coefficient in Tunnelling and Its Engineering Application
(1 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031;3 Sichuan Highway Planning, Survey, Design and Research Ltd., Chengdu 610041)
Download: PDF (2237KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  现行隧道设计中广泛采用荷载-结构法,其中合理地确定围岩抗力系数至关重要。文章基于可较好反映岩体非线性破坏特征及可解释岩体拉应力区及低应力区对围岩强度影响的Hoek-Brown准则,以符合理想弹塑性模型的深埋圆形隧道为研究对象,分析了围岩的应力及位移,进而依据Winkler假定求得围岩抗力系数的计算公式,并依托郑万高铁向家湾隧道工程进行了工程应用分析。研究结果表明:(1)基于Hoek-Brown准则的围岩抗力系数计算方法综合考虑了岩体的应力状态、结构及岩块强度等因素的影响,更为符合实际;(2)现场应用时,可通过岩石饱和单轴压缩试验、岩体及岩石弹性波速试验,先确定BQ以近似确定GSI,进而确定岩体参数,实现参数的定量化选取;(3)依托向家湾隧道的工程应用情况表明,围岩抗力系数的计算结果接近规范的建议区间,一定程度上说明了计算结果的合理性。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王志龙 1
2 周仁强 3 杨 涅 1
2 王明年 1
2 刘大刚 1
2
关键词:   
Abstract: The load-structure method has been widely used in the current tunnel design, so it is very important to determine the rock resistance coefficient reasonably. Taking a deep-buried circular tunnel as the research object,which conforms to the ideal elastic-plastic mode, the stress and displacement of surrounding rock are analyzed base on the Hoek-Brown criterion, which can better reflect the non-linear failure characteristics of rock mass and explain the influence of tensile stress zone and low stress zone on the strength of surrounding rock mass. Then the formula for calculating the rock resistance coefficient is obtained by Winkler hypothesis. Based on the Xiangjiawan tunnel on Zhengzhou-Wanzhou high-speed railway, the engineering application analysis is carried out. The results show that: 1)as for the method of calculating the rock resistance coefficient based on Hoek-Brown criterion, the influences of stress state, structure and strength of rock mass are taken into account, which is more practical; 2) in field application, BQ can be determined by saturated uniaxial compression test, elastic wave velocity test of rock mass and rock, and then GSI can be approximately determined by BQ, finally rock mass parameters can be determined, realizing the quantitative selection of parameters; 3) based on the engineering application in Xiangjiawan tunnel, it is shown that the calculation result of the rock resistance coefficient is close to the recommended range specified in the code, verifying the rationality of the calculation results to some extent.
KeywordsHoek-Brown criterion,   Railway tunnel,   Rock resistant coefficient,   Calculation method,   Engineering application     
基金资助:基金项目:中国国家铁路集团有限公司科技研究开发计划课题(P2019G038).
作者简介: 作者简介:王志龙(1992-),男,博士研究生,主要从事隧道及地下工程研究工作,E-mail: 1483521612@qq.com. 通讯作者:周仁强(1979-),男,高级工程师,主要从事隧道及地下工程设计及科研工作,E-mail: 178244913@qq.com.
引用本文:   
王志龙 1, 2 周仁强 3 杨 涅 1, 2 王明年 1等 .基于Hoek-Brown准则的隧道围岩抗力系数计算方法及工程应用[J]  现代隧道技术, 2020,V57(5): 84-90
WANG Zhilong1, 2 ZHOU Renqiang3 YANG Nie1, 2 WANG Mingnian1 etc .Hoek-Brown Criterion Based Calculation Method of Rock Resistant Coefficient in Tunnelling and Its Engineering Application[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(5): 84-90
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I5/84
 
没有本文参考文献
[1] 严 健 1,2 蔚艳庆 3 何 川 1 周子寒 1 苟 昊 1.川藏公路热冻链接技术及在隧道洞口段融雪除冰应用[J]. 现代隧道技术, 2020,57(5): 1-9
[2] 阎锡东 1 高 军 1 韩 翡 2 李 正 1.隧道穿越活动断裂带风险评价研究及工程应用[J]. 现代隧道技术, 2020,57(5): 10-22
[3] 王帅帅 1,2 谌桂舟 2 郭 春 2 白永厚 3.高海拔隧道施工机械动力性能研究[J]. 现代隧道技术, 2020,57(5): 23-29
[4] 龚琛杰 1 阳军生 1 傅金阳 1, 2.复合岩层大直径越江盾构隧道管片施工裂损特征及影响因素分析[J]. 现代隧道技术, 2020,57(5): 30-42
[5] 张 新.基于随机源模型的新型微动探测技术在上软下硬地层盾构隧道中的应用研究[J]. 现代隧道技术, 2020,57(5): 43-50
[6] 黄忠凯 1 张冬梅 1,2.软土地层浅埋盾构隧道地震易损性分析[J]. 现代隧道技术, 2020,57(5): 51-60
[7] 江 桁 1 刘学增 2 朱合华 1.基于隧道快速检测车数据的公路隧道衬砌开裂识别模型研究[J]. 现代隧道技术, 2020,57(5): 61-65
[8] 田崇明 1 叶 飞 1 宋桂锋 2 王庆龙 2 赵 猛 1 何 彪 1 王 坚 1 韩兴博 1.隧道排水系统结晶堵塞机理及防治措施初探[J]. 现代隧道技术, 2020,57(5): 66-76
[9] 刘思聪 1 赵承桥 2 马晨骁 1 彭芳乐 1.城市更新视域下的早期商务区地下空间互联互通问题探讨——以陆家嘴CBD为例[J]. 现代隧道技术, 2020,57(5): 77-83
[10] 孙玉龙 闫治国.基于过程荷载的超大跨扁平地下洞室围岩压力计算研究[J]. 现代隧道技术, 2020,57(5): 91-98
[11] 周 中 陈 云 缪林武.基于当层法的新建隧道下穿既有隧道引起的变形预测模型研究[J]. 现代隧道技术, 2020,57(5): 99-103
[12] 吕玺琳 1,2 赵庾成 1,2 蔡剑韬 3.盾构隧道施工扰动诱发富水砂层地陷变形数值模拟[J]. 现代隧道技术, 2020,57(5): 104-109
[13] 陈伟杰 1 苏 栋 1,2 陈湘生 1,2 庞小朝 2,3 雷国平 1,2.基床系数和侧压力系数对盾构隧道变形的影响研究[J]. 现代隧道技术, 2020,57(5): 110-115
[14] 吕敬富 1 杜江梅 1 罗泽军 2,3 张金江 1 缪亚彪 1.岩口公路隧道高陡边坡稳定性及支护参数研究[J]. 现代隧道技术, 2020,57(5): 116-124
[15] 王志超 谢 远 谢永利.黄土隧道新型支护结构施工力学性能分析[J]. 现代隧道技术, 2020,57(5): 125-135
Copyright 2010 by 现代隧道技术