[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2021, Vol. 58 Issue (5) :96-103    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
大断面土压平衡矩形顶管多刀盘实测扭矩参数研究
(1 内蒙古科技大学土木工程学院,包头 014010;2 内蒙古科技大学矿山安全与地下工程院士专家工作站,包头 014010)
Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads
(1 School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 2 Academicians and Experts Workstation of Mine Safety and Underground Engineering, Inner Mongolia University of Science and Technology, Baotou 014010)
Download: PDF (2587KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 矩形顶管机通常配置多个刀盘对开挖面土体进行分区切削顶进。不同位置刀盘扭矩配置参数直接决定了矩形顶管机的掘进效率与安全。文章以包头市经三路地下综合管廊顶管隧道为工程背景,采用理论分析、现场实测等方法,针对顶进过程中的不同位置刀盘实测扭矩变化规律及扭矩配置问题进行研究,得到以下结论:刀盘与土体的摩擦是刀盘扭矩的主要影响因素;刀盘扭矩实测值与计算值较为接近,实测扭矩随顶进距离呈动态波动变化;三组刀盘扭矩值大小不等,其中,第一组1号中心大刀盘扭矩最大,第三组次之,第二组最小;第一组1号中心大刀盘额定扭矩值约为扭矩实测值的1.36倍,第二组小刀盘额定扭矩值约为实测扭矩值的3.11倍,第三组小刀盘额定扭矩值约为实测扭矩值的2.8倍,小刀盘额定扭矩值安全储备设置较高,可通过适当降低小刀盘额定扭矩值进行优化。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
许有俊 1
2 黄正东 1
2 张 旭 1
2 张 朝 1
2 康佳旺 1
2 周 薇 1
关键词:   
Abstract: A rectangular pipe jacking machine is usually equipped with multiple cutterheads to cut and jack the soil mass on the excavation face by zoning. The torque setting parameters of cutterheads in different positions directly affect the excavation efficiency and safety of rectangular pipe jacking machines. Taking the pipe jacking construction of the Jingsan Road underground utility tunnel in Baotou as the engineering background, this paper uses various methods such as theoretical analysis and field measurement to study the changing pattern of the measured torques of cutterheads in different positions and the relevant torque settings during the jacking process. The conclusions are drawn as follows: the friction between the cutterhead and the soil mass mainly affects the torque of the cutterhead;the measured torque values of the cutterheads are close to the calculated values, and the former fluctuates dynamically with the jacking distance; the torques of three groups of cutterheads are of different values, of which the torque of the No.1 central large cutterhead in the first group is the largest, while that in the third group is the second and that in the second group is the smallest; the rated torque value of the No.1 central large cutterhead in the first group is about 1.36 times the measured torque value, while that of the small cutterheads in the second group is about 3.11 times the measured value, and that of the small cutterheads in the third group is about 2.8 times the measured value.The safety reserve setting of the rated torque value of the small cutterheads is quite high, and optimization could be achieved by appropriately reducing the rated torque value of the small cutterheads.
KeywordsSubway,   Rectangular EPB pipe jacking machine,   Theoretical analysis,   Torque setting,   Measured torque     
基金资助:内蒙古自然科学基金(2017MS(LH)0523).
作者简介: 许有俊(1979-),男,博士,教授,硕士生导师,主要从事隧道与地下工程相关的研究与教学工作,E-mail: xyoujun@163.com. 通讯作者:黄正东(1996-),男,硕士研究生,主要从事隧道与地下工程的研究工作,E-mail: 1311586802@qq.com.
引用本文:   
许有俊 1, 2 黄正东 1, 2 张 旭 1等 .大断面土压平衡矩形顶管多刀盘实测扭矩参数研究[J]  现代隧道技术, 2021,V58(5): 96-103
XU Youjun1, 2 HUANG Zhengdong1, 2 ZHANG Xu1 etc .Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(5): 96-103
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I5/96
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术