大断面土压平衡矩形顶管多刀盘实测扭矩参数研究
(1 内蒙古科技大学土木工程学院,包头 014010;2 内蒙古科技大学矿山安全与地下工程院士专家工作站,包头 014010)
Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads
(1 School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 2 Academicians and Experts Workstation of Mine Safety and Underground Engineering, Inner Mongolia University of Science and Technology, Baotou 014010)
Download: PDF (2587KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 矩形顶管机通常配置多个刀盘对开挖面土体进行分区切削顶进。不同位置刀盘扭矩配置参数直接决定了矩形顶管机的掘进效率与安全。文章以包头市经三路地下综合管廊顶管隧道为工程背景,采用理论分析、现场实测等方法,针对顶进过程中的不同位置刀盘实测扭矩变化规律及扭矩配置问题进行研究,得到以下结论:刀盘与土体的摩擦是刀盘扭矩的主要影响因素;刀盘扭矩实测值与计算值较为接近,实测扭矩随顶进距离呈动态波动变化;三组刀盘扭矩值大小不等,其中,第一组1号中心大刀盘扭矩最大,第三组次之,第二组最小;第一组1号中心大刀盘额定扭矩值约为扭矩实测值的1.36倍,第二组小刀盘额定扭矩值约为实测扭矩值的3.11倍,第三组小刀盘额定扭矩值约为实测扭矩值的2.8倍,小刀盘额定扭矩值安全储备设置较高,可通过适当降低小刀盘额定扭矩值进行优化。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
许有俊 1
2 黄正东 1
2 张 旭 1
2 张 朝 1
2 康佳旺 1
2 周 薇 1
关键词:   
Abstract: A rectangular pipe jacking machine is usually equipped with multiple cutterheads to cut and jack the soil mass on the excavation face by zoning. The torque setting parameters of cutterheads in different positions directly affect the excavation efficiency and safety of rectangular pipe jacking machines. Taking the pipe jacking construction of the Jingsan Road underground utility tunnel in Baotou as the engineering background, this paper uses various methods such as theoretical analysis and field measurement to study the changing pattern of the measured torques of cutterheads in different positions and the relevant torque settings during the jacking process. The conclusions are drawn as follows: the friction between the cutterhead and the soil mass mainly affects the torque of the cutterhead;the measured torque values of the cutterheads are close to the calculated values, and the former fluctuates dynamically with the jacking distance; the torques of three groups of cutterheads are of different values, of which the torque of the No.1 central large cutterhead in the first group is the largest, while that in the third group is the second and that in the second group is the smallest; the rated torque value of the No.1 central large cutterhead in the first group is about 1.36 times the measured torque value, while that of the small cutterheads in the second group is about 3.11 times the measured value, and that of the small cutterheads in the third group is about 2.8 times the measured value.The safety reserve setting of the rated torque value of the small cutterheads is quite high, and optimization could be achieved by appropriately reducing the rated torque value of the small cutterheads.
KeywordsSubway,   Rectangular EPB pipe jacking machine,   Theoretical analysis,   Torque setting,   Measured torque     
基金资助:内蒙古自然科学基金(2017MS(LH)0523).
作者简介: 许有俊(1979-),男,博士,教授,硕士生导师,主要从事隧道与地下工程相关的研究与教学工作,E-mail: xyoujun@163.com. 通讯作者:黄正东(1996-),男,硕士研究生,主要从事隧道与地下工程的研究工作,E-mail: 1311586802@qq.com.
引用本文:   
许有俊 1, 2 黄正东 1, 2 张 旭 1等 .大断面土压平衡矩形顶管多刀盘实测扭矩参数研究[J]  现代隧道技术, 2021,V58(5): 96-103
XU Youjun1, 2 HUANG Zhengdong1, 2 ZHANG Xu1 etc .Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(5): 96-103
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I5/96
 
没有本文参考文献
[1] 魏 纲 1,2 赵得乾麟 1 黄 睿 1.盾构施工对邻近隧道影响的模型试验研究综述[J]. 现代隧道技术, 2021,58(5): 1-8
[2] 丁 智 1,2 何晨阳 1 张 霄 1 张文宏 3 吴 胜 4.含气土盾构施工影响及控制技术研究展望[J]. 现代隧道技术, 2021,58(5): 9-20
[3] 章龙管 1 刘绥美 1 李开富 1 徐 进 2,3,4 王胜楠 3,5 李 强 3.基于故障树与贝叶斯网络的地铁盾构施工风险预测[J]. 现代隧道技术, 2021,58(5): 21-29
[4] 郑 波 1,2 吴 剑 1,2 郑金龙 3 匡 亮 4 郭 瑞 1,2.基于现场试验的川西高海拔隧道防冻参数研究[J]. 现代隧道技术, 2021,58(5): 30-36
[5] 仇文革 万世付 高刚刚 赵海霖 戚幸鑫.砂卵石地层盾构隧道下穿铁路咽喉区地表沉降控制研究[J]. 现代隧道技术, 2021,58(5): 37-45
[6] 王志杰 1 李金宜 1 邓宇航 1 杜逸文 1 周 平 1 白小可 2 李峰刚 2.盐岩隧道施工病害揭示及致灾因子研究[J]. 现代隧道技术, 2021,58(5): 46-55
[7] 高 鑫 王文娟 李清菲 冯世杰 吴 琦.双护盾TBM步进过站路径研究[J]. 现代隧道技术, 2021,58(5): 56-64
[8] 李思明 1 禹海涛 2 薛光桥 3 徐 磊 4.穿越土-岩变化地层盾构隧道地震响应分析[J]. 现代隧道技术, 2021,58(5): 65-72
[9] 常 刚 1,2 牌立芳 3,4 庞伟军 1,4 吴红刚 1,2,4 剡理祯 1.深埋硬岩组合隧道围岩开挖变形影响研究[J]. 现代隧道技术, 2021,58(5): 73-77
[10] 陈玉坤 1 管会生 1 周 磊 2 刘 成 1.基于BP神经网络的盘形滚刀磨损预测研究[J]. 现代隧道技术, 2021,58(5): 78-84
[11] 宋 洋 1 王韦颐 2 杜春生 3.富水圆砾与泥岩复合地层泥水盾构超近接下穿既有地铁隧道掘进参数优化研究[J]. 现代隧道技术, 2021,58(5): 85-95
[12] 潘伟强 1 焦伯昌 2 柳 献 2 曾 华 3 吉茂杰 3.深埋大断面钢结构顶管接触压力及受力特性现场试验研究[J]. 现代隧道技术, 2021,58(5): 104-113
[13] 陈祉颖 牛国庆 王舒梦 郭宸玮.基于正交模拟试验的隧道空气幕参数优化研究[J]. 现代隧道技术, 2021,58(5): 114-121
[14] 潘旭东 1 白云龙 1 白云飞 2 张志强 2 廖 霖 1.富水地层冻结法施工渗流场对温度场的影响规律研究[J]. 现代隧道技术, 2021,58(5): 122-128
[15] 郭 瑞 1,2,3 郑 波 2,3 方 林 1,4 吴 剑 2,3.寒区隧道纵向温度场分布特征的模型试验研究[J]. 现代隧道技术, 2021,58(5): 129-139
Copyright 2010 by 现代隧道技术