[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2013, Vol. 50 Issue (1) :34-39    DOI:
综述与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
成都富水砂卵石地层盾构设备配置探讨
中铁十三局集团第二工程有限公司
Discussion of the Modification Plan of the EPB TBM Applied in a Water-Rich Cobblestone Stratum in Chengdu
The 2nd Engineering Co., Ltd of China Railway No.13 Group Co., Ltd
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要       成都地铁1、2号线成功地采用了盾构法施工,但由于成都地质条件以高富水、高卵石含量著称,到现在为止还存在刀具消耗成本大、换刀困难、地表易坍塌及刀盘和螺旋输送机磨损严重等实际问题。文章通过对成都富水砂卵石的地质特点和现用盾构设备的优缺点的分析,提出了将盾体进行适当改进的设想:刀盘由面板式改变为辐条式、螺旋输送机由轴式改变为带式、对卵石的处理方式由破碎为主变为全部排出,这样将可以大大降低施工成本,解决地表易坍塌的问题,创新改进后的盾构设备配置将更适合成都地铁盾构施工。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王国义
关键词     
Abstract: The shield construction technique was successfully used in the Chengdu metro lines 1 and 2. Because of the geological conditions of water-rich cobblestone, this project suffered from a high cost of cutter consumption, difficult cutter changing, surface subsidence, and serious wear to the cutter head and screw conveyor. By analyzing the geological features and advantages and disadvantages of the devices currently used on shield machines, a modification plan for the shield is suggested, including changing from a breasting plate to a spoke for the cutter head, from a shaft to belt for the conveyor, and from main breaking to total discharging, which resulted in greatly reduced construction costs.
Keywords:   
出版日期: 2012-07-29
作者简介: 王国义(1974-),男,高级工程师,主要研究方向:盾构施工与管理,E-mail:116381265@qq.com
引用本文:   
王国义 .成都富水砂卵石地层盾构设备配置探讨[J]  现代隧道技术, 2013,V50(1): 34-39
WANG Guo-Yi .Discussion of the Modification Plan of the EPB TBM Applied in a Water-Rich Cobblestone Stratum in Chengdu[J]  MODERN TUNNELLING TECHNOLOGY, 2013,V50(1): 34-39
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2013/V50/I1/34
 
没有本文参考文献
Copyright 2010 by 现代隧道技术