[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2013, Vol. 50 Issue (1) :67-72    DOI:
研究与分析 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
浅埋隧道洞口段Ⅳ级围岩开挖方案比选数值分析
1.中国矿业大学深部岩土力学与地下工程国家重点实验室,徐州 221008;2.中国矿业大学力学与建筑工程学院,徐州 221008
Numerical Analysis of the Scheme for the Portal Excavation of a Shallow Tunnel in a Grade IV Rock Mass
1 State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology 2 School of Mechanics and Civil Engineering, China University of Mining and Technology
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要     结合隧址地质特征,运用有限元数值分析方法,对比分析了北固山隧道出口段在采用不同开挖工法条件下围岩和支护结构受力与变形规律的差异,同时结合施工工序和工程特点对不同开挖方法的选取进行了分析比选,最后得出了北固山隧道出口段采用弧形导洞预留核心土法开挖是符合隧道设计规范、又满足围岩及支护稳定性要求的施工方案,且施工工艺简易,经济。研究成果将对同类地质条件下隧道的设计和施工具有指导意义。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
杨灵1.2
韩立军1.2
蔚立元1.2
关键词     
Abstract: In light of the geological conditions of the Beigushan tunnel, the differences of force applied on the surrounding rock and the supporting structure, as well as the relative deformation law concerning the exit section, by different construction methods were compared. An analysis was performed and a construction method was selected based on the construction procedures and characteristics. It was concluded that the Beigushan tunnel should be constructed by the method of arched heading with reserved core soil, since this scheme not only complies with tunnel design specifications and meets the requirements of stability, but is also simple and cost effective.
Keywords:   
出版日期: 2012-07-27
基金资助:

国家自然科学基金(NO.51278423)

作者简介: 杨灵(1988-),男,硕士研究生,主要从事岩石力学与地下工程稳定性方面的研究,E-mail:yanglingcumt@126.com
引用本文:   
杨灵1.2, 韩立军1.2, 蔚立元1.2 .浅埋隧道洞口段Ⅳ级围岩开挖方案比选数值分析[J]  现代隧道技术, 2013,V50(1): 67-72
YANG Ling-1.2, HAN Li-Jun-1.2, Wei-Li-Yuan-1.2 .Numerical Analysis of the Scheme for the Portal Excavation of a Shallow Tunnel in a Grade IV Rock Mass[J]  MODERN TUNNELLING TECHNOLOGY, 2013,V50(1): 67-72
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2013/V50/I1/67
 
没有本文参考文献
Copyright 2010 by 现代隧道技术