Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2011, Vol. 48 Issue (6) :163-168    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Application of Comprehensive Geological Prediction Technology to the Tanchang Tunnel
(Guizhou Provincial Expressway Development Cooperation, Guiyang  550001)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract This paper presents the main geological problems encountered (shallow overburden, coal seam, gas, fractured zone, fault, karst, water and mud bursts, etc.) and the key points and difficulties of geological prediction in the Tanchang Tunnel. In addition, a detailed analysis of the geological prediction of water and mud burst occurrences in the shallow-buried portal and middle karst sections is discussed in light of the HSP (Horizontal acoustic reflection) prediction technique combined with echolocation. Construction demonstrated that the prediction results agreed very well with the actual situation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
GONG Yu-Hua
WANG Yong
KeywordsTunnel construction   Karst   Comprehensive geological prediction   Monitoring and measuring     
Abstract: This paper presents the main geological problems encountered (shallow overburden, coal seam, gas, fractured zone, fault, karst, water and mud bursts, etc.) and the key points and difficulties of geological prediction in the Tanchang Tunnel. In addition, a detailed analysis of the geological prediction of water and mud burst occurrences in the shallow-buried portal and middle karst sections is discussed in light of the HSP (Horizontal acoustic reflection) prediction technique combined with echolocation. Construction demonstrated that the prediction results agreed very well with the actual situation.
KeywordsTunnel construction,   Karst,   Comprehensive geological prediction,   Monitoring and measuring     
published: 2011-10-14
Cite this article:   
GONG Yu-Hua, WANG Yong .Application of Comprehensive Geological Prediction Technology to the Tanchang Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(6): 163-168
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I6/163
 
No references of article
[1] CHANG Weixue1,2 LIANG Qingguo1 LI Qiwei1 FAN Chuntan1,3 WEI Jian4.Study on Large Deformation Characteristics and Control Measures of Water-rich Phyllite Rock Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 236-244
[2] HAO Yijie1 LI Gang2 SHEN Dan3 DENG Youwei1 LIU Yiyang1.Study on Automatic Identification and Real-time Measurement Technology for Tunnel Surrounding Rock Settlement Based on Improved YOLOv5[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(5): 58-66
[3] LU Junfu1 ZHANG Hongxin1 PEI Qifan2.Classification Method of Monitoring Level in Railway Tunnel Construction Phase and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 202-208
[4] DONG Jiansong.Construction Technology of Xiamen Haicang Subsea Tunnel Crossing Weathered Trough[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 197-203
[5] YE Xinxin1 MIAO Miao2 ZHONG Yujian2 XU Shuoshuo2 DU Ke2.Analysis on Reinforcement Effect of Surface Grouting in Shallow-Buried Tunnels with Asymmetrical Loading and Abundant Underground Water[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 229-236
[6] ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204
[7] GUAN Xiaojun.Preliminary Study on Internal Forces and Deformation Laws of the Initial Support of Railway Tunnels Passing through Various Strata in the Paleogully[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 175-181
[8] YAO Xiaoming1 SHU Bo2 LI Bo.Safety Control Technology for the Newly Constructed Shield Tunnels Approaching Existing Metro Lines Underneath[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 243-
[9] LIU Qingfeng1 LIU Qingzhi2.Statistical Analysis of Monitoring Data and Reserved Deformation Based on Interval Estimation Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 142-147
[10] ZUO Zhuo1 FU Helin2 ZHANG Jiabing2 LIN Rui 2 GONG Jiabin3.Measurement and Analysis of Deep Foundation Pit Excavation in Deep Soft Soil Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 107-113
[11] LI Jianlin WU Jingang BI Qiang.Study on the Design and Construction Method for the Large-span Highway Tunnel with Small Interval[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 157-162
[12] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[13] GAO Meiben1 LI Tianbin1 ZHENG Jianguo2 WANG Baoming3 MENG Lubo1 REN Yang1.The Primary Support Deformation Mechanism and Supporting Measures for the Tunnel across Anticline Core Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 169-175
[14] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[15] YANG Feng.Determination Method for a Reasonable Installation Time of the Tunnel′s Secondary Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 56-64
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY