MODERN TUNNELLING TECHNOLOGY 2012, Vol. 49 Issue (2) :59-64    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study of Key Techniques for a Shield Machine Passing Through a Mined Tunnel
(1 Shenzhen Municipal Engineering Corporation, Shenzhen 518000;
2 Shenzhen Water Resources Planning & Design Institute, Shenzhen 518000)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Using the shield passing through the built tunnel of the Qiaoxiang Station to Xiangmi Station section of the Shenzhen Metro Lot 2222 as an example, this paper introduces the method used to fill the gap between shield segments and primary support in terms of jack thrust checking and grout proportions optimization. The construction procedures of a shield passing through a built tunnel were improved by means of equipment reconstruction and filling dosage optimization. The GFRP early strength concrete was sprayed and the shield machine attitude was controlled with the help of jack stroke error and deflection angle calculations for each segment ring.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
DENG Bin-1
GU Xiao-Fang-2
Keywords Shield passing through built tunnel   Shield construction   GFRP rebar   Gap filling     
Abstract: Using the shield passing through the built tunnel of the Qiaoxiang Station to Xiangmi Station section of the Shenzhen Metro Lot 2222 as an example, this paper introduces the method used to fill the gap between shield segments and primary support in terms of jack thrust checking and grout proportions optimization. The construction procedures of a shield passing through a built tunnel were improved by means of equipment reconstruction and filling dosage optimization. The GFRP early strength concrete was sprayed and the shield machine attitude was controlled with the help of jack stroke error and deflection angle calculations for each segment ring.
Keywords Shield passing through built tunnel,   Shield construction,   GFRP rebar,   Gap filling     
published: 2012-02-16
Cite this article:   
DENG Bin-1, GU Xiao-Fang-2 .Study of Key Techniques for a Shield Machine Passing Through a Mined Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(2): 59-64
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I2/59
 
No references of article
[1] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[2] ZHONG Changping1,3 ZHU Weibin2 QIU Xiaopei4 LI Shijia1 CHEN He2 HUANG Weiran1 ZHOU Cuiying3 .On a New Auxiliary Method of Shield Construction with Paste HDN[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 1-7
[3] .Experimental Study on the Influence of Slurry Properties on the Airtightness of the Filter Cakes of Slurry Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(2): 134-140
[4] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[5] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[6] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
[7] Li Xinyu, Zhang Dingli, Fang Qian, Song Haoran.On Water Burst Patterns in Underwater Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 24-31
[8] Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
[9] Liu Guangfeng1, Chen Fangwei2, Zhou Zhi1, Zhang Shilong3, Liu Mingqiang1.Identification of Investment Risks for River-Crossing Tunnels Based on Grey Fuzzy Multi-Attribute Group Decision Making[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 41-48
[10] Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54
[11] Zhang Boyang1, Zhao Xiaopeng1, Zhang Yaguo2, Chen Yu1.Risk Control for Saturated Hyperbaric Intervention in Slurry Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 55-61
[12] Zhang Ning1,2 Yao Zhanhu3 Zhu Wei1,2 Min Fanlu1,2 Jiang Teng1,2.Effects of Filter Cake Charateristics on Airtightness during Hyperbaric Intervention in Slurry Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 62-67
[13] Min Fanlu1,2 Zhao Xiaopeng3 Zhu Wei1,2 Zhang Ning1,2.Airtightness of Filter Cakes Formed under Different Slurry Infiltration Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 68-73
[14] Zhang Yingming Hu Huitao Zhang Boyang.Study of Equipment and Operations Related to Saturated Hyperbaric Intervention Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 201-206
[15] Li Yufeng1,2, Peng Limin1, Lei Mingfeng1,2.Dynamics Issues Regarding High-Speed Railway Crossing Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 8-15
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY