Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2013, Vol. 50 Issue (3) :183-190    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Application of the Freezing and Horizontal Grouting Methods
to the Shield Arrival for the Tianjin Metro
(Tianjin Branch of Zhongnan Construction Industrial Group, Tianjin  300000)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract   Shield launching and arrival are key and risky elements in the construction of shield driving tunnels. To prevent an unstable enclosure structure, the soil mass at the end side of the tunnel must be consolidated. In this paper, the pros and cons of conventional reinforcement methods are analyzed and compared. Consolidation should be selected by considering the following: geological conditions, groundwater level, overburden, shield type and diameter, working environment, construction safety and accessibility, economy and construction period, etc. As for the case of the Tianjin Metro, a combination of the horizontal grouting and freezing methods was adopted and the concrete measures are described.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords    Shield   Arriving   End consolidation   Freezing   Horizontal grouting     
Abstract:   Shield launching and arrival are key and risky elements in the construction of shield driving tunnels. To prevent an unstable enclosure structure, the soil mass at the end side of the tunnel must be consolidated. In this paper, the pros and cons of conventional reinforcement methods are analyzed and compared. Consolidation should be selected by considering the following: geological conditions, groundwater level, overburden, shield type and diameter, working environment, construction safety and accessibility, economy and construction period, etc. As for the case of the Tianjin Metro, a combination of the horizontal grouting and freezing methods was adopted and the concrete measures are described.
Keywords ,   Shield,   Arriving,   End consolidation,   Freezing,   Horizontal grouting     
published: 2012-09-11
Cite this article:   
.Application of the Freezing and Horizontal Grouting Methods
to the Shield Arrival for the Tianjin Metro[J]  MODERN TUNNELLING TECHNOLOGY, 2013,V50(3): 183-190
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2013/V50/I3/183
 
No references of article
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY