Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2014, Vol. 51 Issue (4) :191-194    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Technical Measures for Blasting Vibration Control in Urban Underground Works
(Huaibei Blasting Research Institute, CCTEG, Huaibei, 235000)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract  This paper presents the generating mechanism of blasting vibration and analyzes the hazards induced by the blasting vibration of urban underground works. It concludes eight kinds of technical measures for blasting vibration control, such as controlling the initialing charge per delay interval, a reasonable interval time of initiation, proper cut type, and non-explosive blasting based on the engineering practice. Ultimately, it points out that the selection of appropriate vibration control measures should be based on the specific conditions during blasting of urban underground works.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
XUE Xian-Bin
Zhang-Ji-Can
Sun-Xue-Qin
Keywords Underground works   Blasting vibration   Control measures     
Abstract: This paper presents the generating mechanism of blasting vibration and analyzes the hazards induced by the blasting vibration of urban underground works. It concludes eight kinds of technical measures for blasting vibration control, such as controlling the initialing charge per delay interval, a reasonable interval time of initiation, proper cut type, and non-explosive blasting based on the engineering practice. Ultimately, it points out that the selection of appropriate vibration control measures should be based on the specific conditions during blasting of urban underground works.
Keywords Underground works,   Blasting vibration,   Control measures     
published: 2013-09-01
Cite this article:   
XUE Xian-Bin, Zhang-Ji-Can, Sun-Xue-Qin .Technical Measures for Blasting Vibration Control in Urban Underground Works [J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(4): 191-194
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I4/191
 
No references of article
[1] CHEN Xiangsheng1,2,3,4 HE Qiufeng1,2,3,4 WU Zezhou1,2,3,4 FU Yanbin1,2,4 CHEN Kunyang1,2,3,4.Current Situation and Reflections on Low-carbon and Sustainable Development of Tunnels and Underground Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 5-17
[2] FAN Wenhao1,2 XIE Shenghao1,2 ZHOU Feicong1,2 WANG Zhijie1,2 ZHANG Kai3 LUO Yunjian3.A Case Study on Adjacent Impact Zoning and Control Measures for New Double-line Shield Tunnel Undercrossing Existing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 43-57
[3] ZHAO Wanqiang1 LU Junfu2 TANG Yin1 ZHENG Changqing1.Study on Risk Level Classification Method and Control Measures for Railway Tunnel Floor Heave[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 178-187
[4] SONG Zhanping1,2,3 XU Xiaojing1,2 LIU Wei1,2 LI Lingfeng4.A Review of Study on Energy-absorbing Rockbolts and Static/Dynamic Test Methods[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 1-13
[5] Yu Jian.Study on Construction of Remote Automatic Monitoring and Early Warning System for Tunnel and Underground Works[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 62-72
[6] WANG Yesheng1,2 WU Yong1,2 ZHAO Liangyun3 LI Wei3 JIANG Yijie4 ZHAO Huan4 DING Zhi5,6.Research & Development and Application Analysis of Risk Ranking Management and Control Platform for Shield Construction of Urban Underground Works[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 76-89
[7] Felix Amberg.Tunnel Excavation Review and Outlook[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 1-6
[8] SUN Shuangchi1,2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1.Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 103-110
[9] ZHU Weibin1, 2 ZHANG Hua3 HUANG Hui4.Analysis of and Prevention Countermeasures for Underground Engineering Risks in Red Bed Areas with Developed Karst[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 179-186
[10] FENG Jinghui ZHU Ying.On Ground Reinforcement Measures and Influence on Surrounding Building and Utility Deformation during Enlarging Construction of a Shield Tunnel by CRD Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 204-212
[11] CHEN Fudong1 LEI Mingfeng1 ZHENG Bangyou2 WU Zhigang2 YAO Yu2.Study on Optimization of Design Parameters of One-sided Water Stopping Curtain Based on the Orthogonal Test[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 61-66
[12] CHEN Peishuai1,2 WANG Wei1,3 WU Zhongshi1,4 YUAN Qing1,4 JIANG Hong1,5 ZHAI Shihong1,5.Study on Deformation Characteristics and Control Measures of Shallow Large-span Loess tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 203-211
[13] LI Qiang1 GAN Penglu2.On Cutter Wearing Control Technology of the Shield Passing through Mixed Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 168-174
[14] LI Junjie.Influence on Deformation and Control Measures: A Case Study of Bored Running Tunnel Construction Adjacent to Existing Subway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 168-174
[15] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 79-87
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY