Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (2) :103-110    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes
(1. Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092; 2. Shanghai Municipal Engineering Design Institute (Group) Co., Ltd., Shanghai 200092)
Download: PDF (3030KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The excavation construction of large-diameter shield tunnels would cause disturbance to the soils, result? ing in ground settlement or heave, and thus bringing serious threats to the structural safety of the building complexes above. Based on a large-diameter shield tunnel passing under a dense group of building complexes in an old neighborhood, this paper first calculates the settlement deformation of the houses on key sections through 2D finite element software, and then compares the calculation results with those through 3D finite element software to analyze the applicability of the two calculation methods. Subsequently, on the basis of the 3D model, it studies the effects of different initial load release rates on the ground surface and house deformation caused by the shield tunnel construction. Finally, by using the theoretical ground settlement data calculated by the Peck formula, it sorts out the internal correlation among the initial load release rate, the ground settlement, and the ground loss rate, and puts forward relevant measures to control deformation. The research results show that the smaller the initial load release rate is, the smaller the ground surface and house settlement as well as corresponding ground loss will be. In terms of ground deformation control, the reduction of the load release rate is equivalent to decreasing the ground loss rate, and the decreasing amounts of initial load release rate, ground settlement, and ground loss rate are in a linear correlation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SUN Shuangchi1
2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1
KeywordsLarge-diameter   Shield tunnel   Control measure   Numerical analysis   Shield tunnels passing under building complexes   Load release rate     
Abstract: The excavation construction of large-diameter shield tunnels would cause disturbance to the soils, result? ing in ground settlement or heave, and thus bringing serious threats to the structural safety of the building complexes above. Based on a large-diameter shield tunnel passing under a dense group of building complexes in an old neighborhood, this paper first calculates the settlement deformation of the houses on key sections through 2D finite element software, and then compares the calculation results with those through 3D finite element software to analyze the applicability of the two calculation methods. Subsequently, on the basis of the 3D model, it studies the effects of different initial load release rates on the ground surface and house deformation caused by the shield tunnel construction. Finally, by using the theoretical ground settlement data calculated by the Peck formula, it sorts out the internal correlation among the initial load release rate, the ground settlement, and the ground loss rate, and puts forward relevant measures to control deformation. The research results show that the smaller the initial load release rate is, the smaller the ground surface and house settlement as well as corresponding ground loss will be. In terms of ground deformation control, the reduction of the load release rate is equivalent to decreasing the ground loss rate, and the decreasing amounts of initial load release rate, ground settlement, and ground loss rate are in a linear correlation.
KeywordsLarge-diameter,   Shield tunnel,   Control measure,   Numerical analysis,   Shield tunnels passing under building complexes,   Load release rate     
Cite this article:   
SUN Shuangchi1, 2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1 .Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 103-110
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I2/103
 
No references of article
[1] WANG Huaizheng1 SONG Zhanping1,2 ZHANG Xuewen3 TIAN Xiaoxu1,2 PAN Hongwei4.Optimization and Application of the Construction Scheme for Large-section Tunnels in Water-rich and Weakly Cemented Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 210-219
[2] YANG Chunshan1 Wei Lixin1 MO Haihong2.Impact on and Prediction of Segment Opening of Shield Tunnels under Seismic Action[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 133-140
[3] ZHOU Xiaojun1 GUO Jian1 YANG Changyu2 QING Weichen2 XIONG Guoxing2 KUANG Wentao2.Study on the Partition Mode of Prefabricated and Assembled Secondary Lining of Double-track Railway Tunnels by Drilling and Blasting Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 46-58
[4] HUANG Peng1,2 WEI Liangwen1,2 ZHANG Xuefu1,2.Study on Reinforcement of Large Arch Foot of Mined and Overlapped Metro Transfer Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 137-147
[5] FENG Jinghui ZHU Ying.On Ground Reinforcement Measures and Influence on Surrounding Building and Utility Deformation during Enlarging Construction of a Shield Tunnel by CRD Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 204-212
[6] LI Siming1 YU Haitao2 XUE Guangqiao3 XU Lei4.Analysis on Seismic Response of Shield Tunnels Passing Through Soil-Rock Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 65-72
[7] YE Xinxin1 MIAO Miao2 ZHONG Yujian2 XU Shuoshuo2 DU Ke2.Analysis on Reinforcement Effect of Surface Grouting in Shallow-Buried Tunnels with Asymmetrical Loading and Abundant Underground Water[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 229-236
[8] LIU Hebing.Study on the Impact of the Capacity Expansion and Renovation Project of the Chengdu-Chongqing Expressway on Xinshuangbei Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 229-234
[9] JIA Yanling1,2,3 ZHOU Shaowen2,3 WANG Gang2,3 ZHOU Weizheng2,3 YANG Kunguang2,3.Study on the Stress Characteristics of the Mid-pillar in the Expansion of an Existing Tunnel into a Double-arch Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 130-138
[10] YUE Hongwu1 MIAO Miao2.Analysis on Pre-grouting Reinforcement Effect of Pipe Roofs for the Shallowburied Mined Tunnel in Soft Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 111-117
[11] WU Hongyu1,2 LU Junfu1 PEI Qifan1.Experimental Analysis on Mechanical Behaviors of the Nodular Cast IronReinforced Concrete Composite Tunnel Liner Slab under Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 127-133
[12] CHEN Peishuai1,2 WANG Wei1,3 WU Zhongshi1,4 YUAN Qing1,4 JIANG Hong1,5 ZHAI Shihong1,5.Study on Deformation Characteristics and Control Measures of Shallow Large-span Loess tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 203-211
[13] ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2.Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 85-90
[14] TIAN Zhiyu1 TIAN Shangzhi1 YANG Feng1 ZHANG Zhaojie1 WANG Bo2.Engineering Measures and Safety Evaluation of Baizhang Tunnel Passing through Flow Plastic Water-rich Fracture Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(2): 176-183
[15] LI Qiang1 GAN Penglu2.On Cutter Wearing Control Technology of the Shield Passing through Mixed Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 168-174
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY