Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh
(1. CCCC SHEC Third Engineering Co., Ltd., Zhenjiang 212021; 2. CCCC Second Harbor Engineering Company Ltd., Wuhan 430040;3. R&D Center for Intelligent Manufacturing Technology of Transportation Infrastructure in Transportation Industry, Wuhan 430040;4. Key Laboratory for Long and Large Bridge Construction Technology in Transportation Industry, Wuhan 430040)
Download: PDF (4527KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The No. 2 cross passage of the Karnaphuli River Tunnel Project in Bangladesh is located in a water-bear? ing silty fine sand stratum below the river bottom center. This cross passage is characterized by large excavation diameter and high water and soil pressure. In order to ensure safe construction of the cross passage in the middle of the river when there is shortage of overseas emergency rescue resources, comprehensive technical measures have been proposed from aspects such as freezing hole layout and drilling, temporary support structure of tunnel, excavation and structure construction: (1) The freezing holes are arranged in inner and outer circles, with supporting features at the bottom; (2) Freezing hole drilling process is conducted by means of step-by-step boring, slow pipe advancing and fast plugging by reducing tapered joint; (3) The steel support structure of ring beam in the main tunnel is superseded by the reinforced annular frame beam at the tunnel portal; (4) The construction process is conducted by means of zoned works, fast pilot tunnel construction, excavation by bench-cut method, expanded excavation opposite to free face and excavation-and-support method; (5) The effects of frost heave and thaw settlement are reduced by fast freezing, natural thawing and track grouting. At last, the major risk points are predicted and analyzed,and the preventive measures are prepared accordingly. As proven by the data from freezing hole temperature monitoring and main tunnel lining structure deformation monitoring, this technology will ensure successful construction of cross passage of large-diameter shield tunnel. Such successful construction experience can be valuable reference in other similar projects at home and abroad.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
HAN Xiaoming1
2 HE Yuan1
2 ZHANG Feilei2
3
4
KeywordsLarge-diameter shield tunnel   Cross passage   Artificial freezing method   Mining method   Water-bearing silty fine sand   Through hole   Water and sand inflow     
Abstract: The No. 2 cross passage of the Karnaphuli River Tunnel Project in Bangladesh is located in a water-bear? ing silty fine sand stratum below the river bottom center. This cross passage is characterized by large excavation diameter and high water and soil pressure. In order to ensure safe construction of the cross passage in the middle of the river when there is shortage of overseas emergency rescue resources, comprehensive technical measures have been proposed from aspects such as freezing hole layout and drilling, temporary support structure of tunnel, excavation and structure construction: (1) The freezing holes are arranged in inner and outer circles, with supporting features at the bottom; (2) Freezing hole drilling process is conducted by means of step-by-step boring, slow pipe advancing and fast plugging by reducing tapered joint; (3) The steel support structure of ring beam in the main tunnel is superseded by the reinforced annular frame beam at the tunnel portal; (4) The construction process is conducted by means of zoned works, fast pilot tunnel construction, excavation by bench-cut method, expanded excavation opposite to free face and excavation-and-support method; (5) The effects of frost heave and thaw settlement are reduced by fast freezing, natural thawing and track grouting. At last, the major risk points are predicted and analyzed,and the preventive measures are prepared accordingly. As proven by the data from freezing hole temperature monitoring and main tunnel lining structure deformation monitoring, this technology will ensure successful construction of cross passage of large-diameter shield tunnel. Such successful construction experience can be valuable reference in other similar projects at home and abroad.
KeywordsLarge-diameter shield tunnel,   Cross passage,   Artificial freezing method,   Mining method,   Water-bearing silty fine sand,   Through hole,   Water and sand inflow     
Cite this article:   
HAN Xiaoming1, 2 HE Yuan1, 2 ZHANG Feilei2 etc .Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 227-235
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I3/227
 
No references of article
[1] ZHANG Ming WAN Bo.Study on Technical Solutions to the Problems in Freezing Method Design and Construction of Subway Cross Passages in Sandy Cobble Stratum with High Flow Rate and High Permeability[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 236-241
[2] CAO Xiangpeng1,2 FENG Kun2 XUE Haoyun2 MAO Sheng1 YU Bo2,3.Study on Transverse Seismic Performance of Double Lining of Large Diameter Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 130-139
[3] CHEN Jingang GUO Qiang ZHOU Hailong HUAI Wenbao DONG Xiaoqi.Construction Scheme and Application Analysis of Synchronous Construction of Subway Shield Tunnels and Freezing Reinforcement for Cross Passages[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 233-240
[4] CUI Qinglong1 LI Jin1 GAO Binyong2 XIONG Xinyue2.Mechanical Properties of Three-inclined Bolts in Longitudinal Joint of Large-diameter Shield Tunnel Segment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 63-71
[5] ZHU Yaohong1 GAO Yimin2 LIU Xian2.Study on the Structural Response of the Main Tunnel with Deep Cross Passages Built by the Mechanical Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 144-154
[6] WEI Longhai1 WANG Miao2 WU Shuyuan1.Overall Design and Key Technologies of Nanjing Jianning West Road Rivercrossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 228-236
[7] HUANG Hui TANG Yongmao CAO Saisai.[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 234-239
[8] ZHOU Xiaojun1 NING Yuansi2 YANG Changyu3.Design and Engineering Application of Prefabricated Structure for Secondary Lining Arch of Double-Track Railway Tunnels Constructed by the Mining Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 204-217
[9] WANG Jianyu.A Critical Reflection on Innovation Themes of Conventional Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 1-9
[10] SUN Shuangchi1,2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1.Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 103-110
[11] PAN Xudong1 BAI Yunlong1 BAI Yunfei2 ZHANG Zhiqiang2 LIAO Lin1.Study on the Influence Pattern of Seepage Field on Temperature Field in the Construction of the Metro Cross Passage by Freezing Method in Water-Rich Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 122-128
[12] ZHAI Qiang GU Weihong JIN Zhaoqin.Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 57-66
[13] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
[14] JIANG Jie1,2,3 QIU Jutao1 CHEN Xianzhi1 OU Xiaoduo1,2,3.Application of Artificial Freezing Method in Construction of Metro Cross Passage in Gravel Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(2): 192-197
[15] ZHANG Junru YE Lun YAN Congwen LIU Dingding CUI Yao FENG Jimeng.Study on the Influence of Approaching Construction of the Trailing Shielddriven Tunnel on the Large-section Mined Tunnel in Argillaceous Siltstone Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 122-132
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY