Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh
(1. CCCC SHEC Third Engineering Co., Ltd., Zhenjiang 212021; 2. CCCC Second Harbor Engineering Company Ltd., Wuhan 430040;3. R&D Center for Intelligent Manufacturing Technology of Transportation Infrastructure in Transportation Industry, Wuhan 430040;4. Key Laboratory for Long and Large Bridge Construction Technology in Transportation Industry, Wuhan 430040)
Download: PDF (4527KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The No. 2 cross passage of the Karnaphuli River Tunnel Project in Bangladesh is located in a water-bear? ing silty fine sand stratum below the river bottom center. This cross passage is characterized by large excavation diameter and high water and soil pressure. In order to ensure safe construction of the cross passage in the middle of the river when there is shortage of overseas emergency rescue resources, comprehensive technical measures have been proposed from aspects such as freezing hole layout and drilling, temporary support structure of tunnel, excavation and structure construction: (1) The freezing holes are arranged in inner and outer circles, with supporting features at the bottom; (2) Freezing hole drilling process is conducted by means of step-by-step boring, slow pipe advancing and fast plugging by reducing tapered joint; (3) The steel support structure of ring beam in the main tunnel is superseded by the reinforced annular frame beam at the tunnel portal; (4) The construction process is conducted by means of zoned works, fast pilot tunnel construction, excavation by bench-cut method, expanded excavation opposite to free face and excavation-and-support method; (5) The effects of frost heave and thaw settlement are reduced by fast freezing, natural thawing and track grouting. At last, the major risk points are predicted and analyzed,and the preventive measures are prepared accordingly. As proven by the data from freezing hole temperature monitoring and main tunnel lining structure deformation monitoring, this technology will ensure successful construction of cross passage of large-diameter shield tunnel. Such successful construction experience can be valuable reference in other similar projects at home and abroad.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
HAN Xiaoming1
2 HE Yuan1
2 ZHANG Feilei2
3
4
KeywordsLarge-diameter shield tunnel   Cross passage   Artificial freezing method   Mining method   Water-bearing silty fine sand   Through hole   Water and sand inflow     
Abstract: The No. 2 cross passage of the Karnaphuli River Tunnel Project in Bangladesh is located in a water-bear? ing silty fine sand stratum below the river bottom center. This cross passage is characterized by large excavation diameter and high water and soil pressure. In order to ensure safe construction of the cross passage in the middle of the river when there is shortage of overseas emergency rescue resources, comprehensive technical measures have been proposed from aspects such as freezing hole layout and drilling, temporary support structure of tunnel, excavation and structure construction: (1) The freezing holes are arranged in inner and outer circles, with supporting features at the bottom; (2) Freezing hole drilling process is conducted by means of step-by-step boring, slow pipe advancing and fast plugging by reducing tapered joint; (3) The steel support structure of ring beam in the main tunnel is superseded by the reinforced annular frame beam at the tunnel portal; (4) The construction process is conducted by means of zoned works, fast pilot tunnel construction, excavation by bench-cut method, expanded excavation opposite to free face and excavation-and-support method; (5) The effects of frost heave and thaw settlement are reduced by fast freezing, natural thawing and track grouting. At last, the major risk points are predicted and analyzed,and the preventive measures are prepared accordingly. As proven by the data from freezing hole temperature monitoring and main tunnel lining structure deformation monitoring, this technology will ensure successful construction of cross passage of large-diameter shield tunnel. Such successful construction experience can be valuable reference in other similar projects at home and abroad.
KeywordsLarge-diameter shield tunnel,   Cross passage,   Artificial freezing method,   Mining method,   Water-bearing silty fine sand,   Through hole,   Water and sand inflow     
Cite this article:   
HAN Xiaoming1, 2 HE Yuan1, 2 ZHANG Feilei2 etc .Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 227-235
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I3/227
 
No references of article
[1] ZHU Meiheng1 CHEN Sirui2 HUANG Zhongkai2 LI Yongbo1 ZHANG Wuyu3 ZHANG Dongmei2.Study on the Deformation Law of Large-diameter Fully Prefabricated Assembled Shield Tunnels under Ground Surcharge[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 161-171
[2] ZHANG Yujin ZHOU Xiaojun YU Bingxin LI Xu ZHANG Chao.Study on the Partitioning Method for Prefabricated Secondary Lining in Conventional Tunnelling Based on the "Contact Friction-Beam-Joint" Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 35-44
[3] GE Zhaoguo.Study on Impact Zoning Method and Zoning Control Technique for Construction of Large-diameter Shield Tunnel Adjacent to Viaduct Pile Foundation Group[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 276-289
[4] HE Weiguo1,2 ZHOU Huagui2 CAO Wei2 HU Bin2.The Latest Developments and Prospects of Underwater Tunnels in China[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 105-123
[5] HAO Pengfei.Study on Construction Quality Control Criteria for Prefabricated Integrated Arcuate Members[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 245-251
[6] ZHENG Zhenji1 HUANG Shuhua2 CHEN Xiangsheng1 ZHANG Liang2 LIU Haoming1 SHENG Jian2 SU Dong1.Analysis of Stress Characteristics of Specially Lined Segment of Superlargediameter Shield Main Tunnel during Mechanically Excavating Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 117-124
[7] SHI Yufeng1,2 CAI Jiacheng1 ZHANG Tao3 ZHANG Hanqiu4 LI Junxian1 GU Dajun5.Test and Analysis of the Effect of the Freezing Construction of Subway Cross Passage on Adjacent Shield Tunnel Segment[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 190-199
[8] XUN Haolin1 LI Peinan2 LIU Jun1 SONG Xingbao3 QIN Yuan3 KOU Xiaoyong3 ZHAI Yixin3.Optimization and Application of Installation Path of Prefabricated Structure in Large-diameter Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 236-244
[9] WANG Jianyu.For the Harmony between Tunnelling and Geological Body ——Discussion on Focused Hot Issues in Conventional Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 1-5
[10] ZHANG Ming WAN Bo.Study on Technical Solutions to the Problems in Freezing Method Design and Construction of Subway Cross Passages in Sandy Cobble Stratum with High Flow Rate and High Permeability[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 236-241
[11] CAO Xiangpeng1,2 FENG Kun2 XUE Haoyun2 MAO Sheng1 YU Bo2,3.Study on Transverse Seismic Performance of Double Lining of Large Diameter Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 130-139
[12] CHEN Jingang GUO Qiang ZHOU Hailong HUAI Wenbao DONG Xiaoqi.Construction Scheme and Application Analysis of Synchronous Construction of Subway Shield Tunnels and Freezing Reinforcement for Cross Passages[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 233-240
[13] CUI Qinglong1 LI Jin1 GAO Binyong2 XIONG Xinyue2.Mechanical Properties of Three-inclined Bolts in Longitudinal Joint of Large-diameter Shield Tunnel Segment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 63-71
[14] ZHU Yaohong1 GAO Yimin2 LIU Xian2.Study on the Structural Response of the Main Tunnel with Deep Cross Passages Built by the Mechanical Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 144-154
[15] WEI Longhai1 WANG Miao2 WU Shuyuan1.Overall Design and Key Technologies of Nanjing Jianning West Road Rivercrossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 228-236
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY