Study on Construction Quality Control Criteria for Prefabricated Integrated Arcuate Members
(China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd., Nanjing 211800)
Download: PDF (3870KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The construction quality of prefabricated integrated arcuate members is a key element in construction of large-diameter shield tunnel, so it is necessary to establish effective and rational control criteria for the construction quality of prefabricated integrated arcuate members. In light of this, the construction quality control criteria for the prefabricated sub-rail structure or box culvert of the existing projects are reviewed, the composition and construction process of prefabricated integrated arcuate members are explained, the construction quality control criteria for prefabricated integrated arcuate members are proposed, and the criteria are practiced in actual works. As the results indicate, construction of the arcuate members that are built under the criteria proposed has high efficiency and good quality, and the members perform well in service.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
HAO Pengfei
KeywordsLarge-diameter shield tunnel   Prefabricated arcuate member   Construction quality   Control criteria     
Abstract: The construction quality of prefabricated integrated arcuate members is a key element in construction of large-diameter shield tunnel, so it is necessary to establish effective and rational control criteria for the construction quality of prefabricated integrated arcuate members. In light of this, the construction quality control criteria for the prefabricated sub-rail structure or box culvert of the existing projects are reviewed, the composition and construction process of prefabricated integrated arcuate members are explained, the construction quality control criteria for prefabricated integrated arcuate members are proposed, and the criteria are practiced in actual works. As the results indicate, construction of the arcuate members that are built under the criteria proposed has high efficiency and good quality, and the members perform well in service.
KeywordsLarge-diameter shield tunnel,   Prefabricated arcuate member,   Construction quality,   Control criteria     
Cite this article:   
HAO Pengfei .Study on Construction Quality Control Criteria for Prefabricated Integrated Arcuate Members[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(1): 245-251
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2024/V61/I1/245
 
No references of article
[1] ZHENG Zhenji1 HUANG Shuhua2 CHEN Xiangsheng1 ZHANG Liang2 LIU Haoming1 SHENG Jian2 SU Dong1.Analysis of Stress Characteristics of Specially Lined Segment of Superlargediameter Shield Main Tunnel during Mechanically Excavating Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 117-124
[2] XUN Haolin1 LI Peinan2 LIU Jun1 SONG Xingbao3 QIN Yuan3 KOU Xiaoyong3 ZHAI Yixin3.Optimization and Application of Installation Path of Prefabricated Structure in Large-diameter Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 236-244
[3] HAN Xiaoming1,2 HE Yuan1,2 ZHANG Feilei2,3,4.Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 227-235
[4] CAO Xiangpeng1,2 FENG Kun2 XUE Haoyun2 MAO Sheng1 YU Bo2,3.Study on Transverse Seismic Performance of Double Lining of Large Diameter Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 130-139
[5] CUI Qinglong1 LI Jin1 GAO Binyong2 XIONG Xinyue2.Mechanical Properties of Three-inclined Bolts in Longitudinal Joint of Large-diameter Shield Tunnel Segment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 63-71
[6] WEI Longhai1 WANG Miao2 WU Shuyuan1.Overall Design and Key Technologies of Nanjing Jianning West Road Rivercrossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 228-236
[7] SUN Shuangchi1,2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1.Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 103-110
[8] ZHANG Jun1 WANG Minghui1,2 XIANG Daoyin1 ZHANG Qiao1 JIANG Shuping1 LIU Weibang1.Quality Management Practice of Tunnel Secondary Lining Construction of Chongqing Section of Zhengzhou-Wanzhou High-speed Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(2): 49-54
[9] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 88-96
[10] GONG Quhong.Common Construction Quality Problems for Railway Tunnel Linings[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 208-211
[11] HE Zegan1 YANG Chunshan1 WEI Lixin1 MO Haihong2.Measurement and Numerical Simulation of Deformation of the Cofferdam with Geotextile Sand-Bags in the Zhoutouzui Immersed Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 180-186
[12] LIANG Yu1 YANG Junsheng1 LIN Hui2.On Segment Floating and Relevant Mechanical Behaviors during Large-Diameter Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 91-97
[13] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[14] Zhao Guang1 Wang Shangao2 Zhang Tao1.The Application of Multi-Beam Bathymetry-Based Riverbed Monitoring Technology in a Large-Diameter Shield Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 195-200
[15] CHEN Ming-Hui, WENG Dun-Li.Quality Control of the Secondary Lining of Bored Metro Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(2): 119-124
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY