Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (5) :228-236    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Overall Design and Key Technologies of Nanjing Jianning West Road Rivercrossing Tunnel Project
(1 .The Second Highway Survey, Design and Research Institute, China Communications, Wuhan 430056; 2. Zhongtian Transportation Construction Investment Group Co. Ltd.,China Communications, Xiangyang 441002)
Download: PDF (4211KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Nanjing Jianning West Road is located in the city′s core area, and the cross-river section adopts a twinbore six-lane large-diameter shield tunnel.The paper expounds the control factors and construction conditions of the project, and introduces the overall design scheme of the tunnel from the aspects of plane, longitudinal section and cross section. By using theoretical analysis, numerical methods and engineering analogy,the key technologies of design and construction for shield tunnelling through the anti-slip group piles of the Changjiang dyke, the long distance crossing through the mixed stratum of soft and hard rock, the shallow covering of fine sand and the tunnelling close to the existing structures are systematically studied, and the optimized final design option is proposed so that the overall function and safety of construction and operation can be best achieved.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WEI Longhai1 WANG Miao2 WU Shuyuan1
KeywordsRiver-crossing tunnel   Large-diameter shield tunnel   Overall design   Key technologies   Anti-sliding pile group     
Abstract: Nanjing Jianning West Road is located in the city′s core area, and the cross-river section adopts a twinbore six-lane large-diameter shield tunnel.The paper expounds the control factors and construction conditions of the project, and introduces the overall design scheme of the tunnel from the aspects of plane, longitudinal section and cross section. By using theoretical analysis, numerical methods and engineering analogy,the key technologies of design and construction for shield tunnelling through the anti-slip group piles of the Changjiang dyke, the long distance crossing through the mixed stratum of soft and hard rock, the shallow covering of fine sand and the tunnelling close to the existing structures are systematically studied, and the optimized final design option is proposed so that the overall function and safety of construction and operation can be best achieved.
KeywordsRiver-crossing tunnel,   Large-diameter shield tunnel,   Overall design,   Key technologies,   Anti-sliding pile group     
Cite this article:   
WEI Longhai1 WANG Miao2 WU Shuyuan1 .Overall Design and Key Technologies of Nanjing Jianning West Road Rivercrossing Tunnel Project[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(5): 228-236
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I5/228
 
No references of article
[1] ZHANG Minqing1 XIN Weike1 JIA Dapeng1 SI Jingzhao2 WANG Huanlong3.Study and Application of Key Technical Parameters of Pre-grouting in High-pressure Water-rich Deep Shaft Face[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 177-186
[2] CUI Qinglong1 LI Jin1 GAO Binyong2 XIONG Xinyue2.Mechanical Properties of Three-inclined Bolts in Longitudinal Joint of Large-diameter Shield Tunnel Segment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 63-71
[3] SUN Shuangchi1,2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1.Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 103-110
[4] HAO Junsuo.Study on Key Intelligent Construction Technologies of Super-long and Deepburied Hydraulic Tunnels under Complex Geological Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 188-196
[5] XIANG Daoyin1 WANG Minghui1 ZHU Jianguo2 LIU Dalin2 ZHANG Qiao1.Key Techniques for Rapid Construction of Parallel Heading of Karst Tunnel in Chongqing Section of Zhengzhou-Wanzhou Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 194-200
[6] WANG Mingnian1,2 GUO Xiaohan1,2 CUI Peng1,2 YU Li1,2.Discussion on the Key Techniques for Disaster Prevention, Evacuation and Rescue of Large-scale Railway Tunnel Group in High Altitude Area[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 1-7
[7] YANG Jihua1 LIANG Guohui2 CAO Jianfeng2 YANG Fengwei1.Study on Key Techniques for TBM1 Section of the Water Conveyance Tunnel of Lanzhou Water Source Construction Project[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 10-17
[8] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 88-96
[9] LI Yue.Staggered Segments and Leakage in a Super-Large Diameter River-Crossing Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 42-46
[10] HU Haorui1 ZHAO Lifeng2 SUN Guangchen3,4 Yang Junsheng3.Application of a Steel Reception Sleeve for Shield Arriving in the Water-Rich
Sandy Stratum of the Suzhou Subway
[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 197-203
[11] WU Jingang.WU JingangFeasibility Study of Immersed Tube Technology for the Qianhaiwan Subsea Tunnel in the Mawan Channel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 28-36
[12] SONG Li.Key Techniques for Construction of the Taiyue Mountain Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 194-199
[13] ZENG Lei- 1 Wang-Shao-Fei- 2, 3 He-Xu-Chun- 2, 3 Ruan-Zhi-Min- 2, 3.Concept, Architecture and Key Techniques of Smart Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 1-8
[14] LIANG Yu1 YANG Junsheng1 LIN Hui2.On Segment Floating and Relevant Mechanical Behaviors during Large-Diameter Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 91-97
[15] WANG Lijun.Study of the Construction Techniques for a Four-Arch Tunnel with a Super-Large Section[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 170-176
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY