Key Techniques for Rapid Construction of Parallel Heading of Karst Tunnel in Chongqing Section of Zhengzhou-Wanzhou Railway
(1 Chongqing-Wanzhou Railway Co., Ltd., Chongqing 400014; 2 The 1st Engineering Co., Ltd. of China Railway Tunnel Group ,Chongqing 401120)
Download: PDF (2838KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to understand the geological conditions in front of working face, to deal with the geological di? saster caused by mud burst and water flow, to further add additional working face to realize advance parallel heading and sectioned construction and to meet the goal of construction period, taking the Xiaoshanxia tunnel of ZhengzhouWanzhou high speed railway as an example, construction organization and management of rapid construction of parallel heading of karst tunnel are discussed mainly from the aspects of improving the entry conditions, adjusting the construction organization, overcoming the construction difficulties of adverse slope, optimizing the construction scheme and so on.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
XIANG Daoyin1 WANG Minghui1 ZHU Jianguo2 LIU Dalin2 ZHANG Qiao1
KeywordsKarst tunnel   Parallel heading   Adverse slope construction   Construction scheme   Optimization     
Abstract: In order to understand the geological conditions in front of working face, to deal with the geological di? saster caused by mud burst and water flow, to further add additional working face to realize advance parallel heading and sectioned construction and to meet the goal of construction period, taking the Xiaoshanxia tunnel of ZhengzhouWanzhou high speed railway as an example, construction organization and management of rapid construction of parallel heading of karst tunnel are discussed mainly from the aspects of improving the entry conditions, adjusting the construction organization, overcoming the construction difficulties of adverse slope, optimizing the construction scheme and so on.
KeywordsKarst tunnel,   Parallel heading,   Adverse slope construction,   Construction scheme,   Optimization     
Cite this article:   
XIANG Daoyin1 WANG Minghui1 ZHU Jianguo2 LIU Dalin2 ZHANG Qiao1 .Key Techniques for Rapid Construction of Parallel Heading of Karst Tunnel in Chongqing Section of Zhengzhou-Wanzhou Railway[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(4): 194-200
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I4/194
 
No references of article
[1] WANG Jianyu.The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 1-11
[2] TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1.Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 12-19
[3] LIAO Yankai1 GUO Deping1 LIU Zhiqiang2 CHEN Dayang2.Application of Peripheral Strain and Squeezing Factor Methods in the Prediction of Large Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 20-26
[4] SUN Jianping TANG Zhaoping.Study and Evaluation on the Design Adaptability of Shield Cutterhead System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 27-36
[5] YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao.Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 37-42
[6] LIU Yuyang1 LAI Hongpeng2 WANG Minxing3 HE Qiumei4.Development and Application of Multi-point Independent Loading Testing System for Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 43-51
[7] ZHENG Aiyuan1 XU Bin2 CHEN Xiangsheng1.Study on Reliability of Steel Fiber Reinforced Concrete Segments of Metro in Marine Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 52-58
[8] CHEN Yunyao1,2 ZHANG Junwei1 MA Shiwei2 LI Xue1.Study on Design Parameters of Sealing Gasket for Segment Joints of Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 59-66
[9] REN Lei1 NIU Bin2 GUO Ting2 LIU Songyu2.Study on the Influence of Flexibility Ratio on Tunnel Seismic Dynamic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 67-73
[10] LIU Ping1 LIU Chi2 WANG Hongtao1 ZHANG Hongjun3 YANG Yong4 ZHANG Xin1 LIU Luyao1.Numerical Simulation Study on the Deformation and Failure Mechanism of Tunnel Surrounding Rock under the Effect of Water-rich Sand Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 74-81
[11] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[12] ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4.Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 91-97
[13] WEN Shuli.Influence of Deep Foundation Pit Excavation on Adjacent Buildings and Optimization of Reinforcement Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 98-103
[14] ZHANG Jing1, 2.Study on Calculations and Influence Factors of Bending Stiffness of Segment Ring Joints of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 104-112
[15] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY