|
2020, Vol. 57(4): 194-200 DOI: | ||
Key Techniques for Rapid Construction of Parallel Heading of Karst Tunnel in Chongqing Section of Zhengzhou-Wanzhou Railway | ||
(1 Chongqing-Wanzhou Railway Co., Ltd., Chongqing 400014; 2 The 1st Engineering Co., Ltd. of China Railway Tunnel Group ,Chongqing 401120) | ||
Received null Revised null | ||
Supporting info | ||
|