Study on Technical Solutions to the Problems in Freezing Method Design and Construction of Subway Cross Passages in Sandy Cobble Stratum with High Flow Rate and High Permeability
(John Finlay Engineering and Technology (Beijing) Co., Ltd., Beijing 100004)
Download: PDF (1990KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Attributed to construction of the South-to-North Water Diversion Project, the groundwater supply in Bei? jing area has been replenished amply and consequently the groundwater level has risen sharply, which makes rail transit system construction more difficult. After practical design and construction of the cross passages using freezing method in a running tunnel section of the Metro Line 12, the supporting measures for freezing method construction in sandy cobble stratum with high flow rate and high permeability have been proposed. Besides, the cause of freezing wall failing to be closured has been analyzed, the weak parts of freezing wall have been identified and thus the engineering solutions have been proposed. Then the technical feasibility of the freezing method used in sandy cobble stratum with high flow rate and high permeability is analyzed. The results will be used for reference in engineering design and construction of the similar projects that use the freezing method.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Ming WAN Bo
KeywordsWater-bearing sandy cobble stratum   Cross passage   Horizontal freezing   High flow rate     
Abstract: Attributed to construction of the South-to-North Water Diversion Project, the groundwater supply in Bei? jing area has been replenished amply and consequently the groundwater level has risen sharply, which makes rail transit system construction more difficult. After practical design and construction of the cross passages using freezing method in a running tunnel section of the Metro Line 12, the supporting measures for freezing method construction in sandy cobble stratum with high flow rate and high permeability have been proposed. Besides, the cause of freezing wall failing to be closured has been analyzed, the weak parts of freezing wall have been identified and thus the engineering solutions have been proposed. Then the technical feasibility of the freezing method used in sandy cobble stratum with high flow rate and high permeability is analyzed. The results will be used for reference in engineering design and construction of the similar projects that use the freezing method.
KeywordsWater-bearing sandy cobble stratum,   Cross passage,   Horizontal freezing,   High flow rate     
Cite this article:   
ZHANG Ming WAN Bo .Study on Technical Solutions to the Problems in Freezing Method Design and Construction of Subway Cross Passages in Sandy Cobble Stratum with High Flow Rate and High Permeability[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 236-241
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I3/236
 
No references of article
[1] HAN Xiaoming1,2 HE Yuan1,2 ZHANG Feilei2,3,4.Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 227-235
[2] CHEN Jingang GUO Qiang ZHOU Hailong HUAI Wenbao DONG Xiaoqi.Construction Scheme and Application Analysis of Synchronous Construction of Subway Shield Tunnels and Freezing Reinforcement for Cross Passages[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 233-240
[3] ZHU Yaohong1 GAO Yimin2 LIU Xian2.Study on the Structural Response of the Main Tunnel with Deep Cross Passages Built by the Mechanical Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 144-154
[4] PAN Xudong1 BAI Yunlong1 BAI Yunfei2 ZHANG Zhiqiang2 LIAO Lin1.Study on the Influence Pattern of Seepage Field on Temperature Field in the Construction of the Metro Cross Passage by Freezing Method in Water-Rich Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 122-128
[5] ZHAI Qiang GU Weihong JIN Zhaoqin.Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 57-66
[6] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
[7] JIANG Jie1,2,3 QIU Jutao1 CHEN Xianzhi1 OU Xiaoduo1,2,3.Application of Artificial Freezing Method in Construction of Metro Cross Passage in Gravel Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(2): 192-197
[8] LI Hai1 ZHAO Dapeng2 ZHU Changsong.Water Inflow Solutions for Metro Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 201-206
[9] WEI Lin-Chun.Experimental Study on Full-Face Concrete Cutting by a Rectangular Pipe-jacking Machine with a Planetary Cutterhead [J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(6): 173-178
[10] CAO Zhi.The Application of CREC-TBM to the Chengdu Metro Construction in a Sandy Cobble Stratum [J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(2): 127-132
[11] Li Qingyu Zhang Jian Yue Peng.Construction Technology for Horizontal Freezing Holes in Metro Connecting Passages in Gravel Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(6): 189-194
[12] Wang Dongyuan1 Gao Zhirong1 Zhu Yongquan2 Zhang Lianghui3.Simulation Analysis of the Excavation Deformation of a Reinforced Subway Cross-Passage in Soft Soil[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(5): 129-134
[13] Shao Chenchen1 Yue Fengtian2 Zhang Yong2 Shi Rongjian2.Experimental Study on the Mechanical Behavior of Artificial Frozen Soil in the Guangzhou Metro Connection Passage Project[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(5): 118-122
[14] SUN Cheng-Wei-1,2, CHOU Pei-Yub-2.Research on the Freezing Method Applied to Tunnel Cross Passages of the Guangzhou Metro[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(3): 161-165
[15] WANG Jie-1, Yang-Ping-1, WANG Xu-Nuo-1, Bao-Jun-An-1.Measurement and Research of the Horizontal Freezing Temperature After Cement Soil Reinforcement in a Shield Launch Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2011,48(6): 99-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY