|
2023, Vol. 60(3): 236-241 DOI: | ||
Study on Technical Solutions to the Problems in Freezing Method Design and Construction of Subway Cross Passages in Sandy Cobble Stratum with High Flow Rate and High Permeability | ||
(John Finlay Engineering and Technology (Beijing) Co., Ltd., Beijing 100004) | ||
Received null Revised null | ||
Supporting info | ||
|