|
2023, Vol. 60(3): 227-235 DOI: | ||
Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh | ||
(1. CCCC SHEC Third Engineering Co., Ltd., Zhenjiang 212021; 2. CCCC Second Harbor Engineering Company Ltd., Wuhan 430040;3. R&D Center for Intelligent Manufacturing Technology of Transportation Infrastructure in Transportation Industry, Wuhan 430040;4. Key Laboratory for Long and Large Bridge Construction Technology in Transportation Industry, Wuhan 430040) | ||
Received null Revised null | ||
Supporting info | ||
|