Analysis on the Construction Hazard Causes of Tunnels with Altitude Difference in the Tilted Soft-hard Interbedded Stratum
(1. State Key Laboratory of Mountain Bridge and Tunnel Engineering, Chongqing Jiaotong University, Chongqing 400074;2.School of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074; 3.Xinjiang Communications Construction Group Co.,Ltd., Urumqi 830016)
Download: PDF (6015KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To solve the construction hazards of tunnels with altitude difference under construction in Guizhou, such as large deformation of surrounding rock and lining cracks, field investigation and numerical simulation are used to research the mechanical response to tunnel construction in the tilted soft-hard interbedded stratum and its hazard causes, and the treatment methods are put forward. The results show that the main geological factors causing tunnel cracking include soft-hard interbedded stratum and topographical changes. Cracking in the crown area is more affected by tilted soft-hard interbedded strata, and the extent of damage to the invert area is more affected by the construction of subsequent driving tunnel; from the steep area at the entrance to the flat area at the exit, the stress and displacement of advanced tunnel are gradually reduced, and the maximum differences are 4.34 MPa and 38.89 mm,respectively. The lining cracking of the advanced tunnel occurs on the left side of the crown, on the left shoulder and at the backfilling of the invert, and the subsequent driving tunnel separately increases the stress on these three locations by 29.84%, 54.58% and 130.61%; the high-gradient tilted strata increase the shear slip between rock formations so that the tunnel deflects to the bottom right, and if the absolute displacement is too large, it will cause uneven deformation of various locations, resulting in asymmetric damage to the tunnel structure; attention should be paid to the following problems during the tunnel construction in a tilted soft-hard interbedded stratum: insufficient bearing capacity of the advanced tunnel base, large deformation of surrounding rock, etc., and the methods, such as full-face grouting, temporary invert and root piles made of steel tubes, can effectively prevent cracking.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Zonghan1
2 HAN Fenglei1
2 ZHANG Xuefu1
2 LI Hongliang3 QIN Zhen1
2 ZHAO Yicong1
2
KeywordsTunnels with altitude difference   Tilted soft-hard interbedded stratum   Hazard causes   Numerical analy? sis     
Abstract: To solve the construction hazards of tunnels with altitude difference under construction in Guizhou, such as large deformation of surrounding rock and lining cracks, field investigation and numerical simulation are used to research the mechanical response to tunnel construction in the tilted soft-hard interbedded stratum and its hazard causes, and the treatment methods are put forward. The results show that the main geological factors causing tunnel cracking include soft-hard interbedded stratum and topographical changes. Cracking in the crown area is more affected by tilted soft-hard interbedded strata, and the extent of damage to the invert area is more affected by the construction of subsequent driving tunnel; from the steep area at the entrance to the flat area at the exit, the stress and displacement of advanced tunnel are gradually reduced, and the maximum differences are 4.34 MPa and 38.89 mm,respectively. The lining cracking of the advanced tunnel occurs on the left side of the crown, on the left shoulder and at the backfilling of the invert, and the subsequent driving tunnel separately increases the stress on these three locations by 29.84%, 54.58% and 130.61%; the high-gradient tilted strata increase the shear slip between rock formations so that the tunnel deflects to the bottom right, and if the absolute displacement is too large, it will cause uneven deformation of various locations, resulting in asymmetric damage to the tunnel structure; attention should be paid to the following problems during the tunnel construction in a tilted soft-hard interbedded stratum: insufficient bearing capacity of the advanced tunnel base, large deformation of surrounding rock, etc., and the methods, such as full-face grouting, temporary invert and root piles made of steel tubes, can effectively prevent cracking.
KeywordsTunnels with altitude difference,   Tilted soft-hard interbedded stratum,   Hazard causes,   Numerical analy? sis     
Cite this article:   
LIU Zonghan1, 2 HAN Fenglei1, 2 ZHANG Xuefu1 etc .Analysis on the Construction Hazard Causes of Tunnels with Altitude Difference in the Tilted Soft-hard Interbedded Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(6): 197-207
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I6/197
 
No references of article
[1] CUI Qinglong1 LI Jin1 GAO Binyong2 XIONG Xinyue2.Mechanical Properties of Three-inclined Bolts in Longitudinal Joint of Large-diameter Shield Tunnel Segment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 63-71
[2] SUN Shuangchi1,2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1.Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 103-110
[3] WANG Huaizheng1 SONG Zhanping1,2 ZHANG Xuewen3 TIAN Xiaoxu1,2 PAN Hongwei4.Optimization and Application of the Construction Scheme for Large-section Tunnels in Water-rich and Weakly Cemented Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 210-219
[4] YANG Chunshan1 Wei Lixin1 MO Haihong2.Impact on and Prediction of Segment Opening of Shield Tunnels under Seismic Action[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 133-140
[5] ZHOU Xiaojun1 GUO Jian1 YANG Changyu2 QING Weichen2 XIONG Guoxing2 KUANG Wentao2.Study on the Partition Mode of Prefabricated and Assembled Secondary Lining of Double-track Railway Tunnels by Drilling and Blasting Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 46-58
[6] HUANG Peng1,2 WEI Liangwen1,2 ZHANG Xuefu1,2.Study on Reinforcement of Large Arch Foot of Mined and Overlapped Metro Transfer Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 137-147
[7] LI Siming1 YU Haitao2 XUE Guangqiao3 XU Lei4.Analysis on Seismic Response of Shield Tunnels Passing Through Soil-Rock Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 65-72
[8] YE Xinxin1 MIAO Miao2 ZHONG Yujian2 XU Shuoshuo2 DU Ke2.Analysis on Reinforcement Effect of Surface Grouting in Shallow-Buried Tunnels with Asymmetrical Loading and Abundant Underground Water[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 229-236
[9] LIU Hebing.Study on the Impact of the Capacity Expansion and Renovation Project of the Chengdu-Chongqing Expressway on Xinshuangbei Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 229-234
[10] JIA Yanling1,2,3 ZHOU Shaowen2,3 WANG Gang2,3 ZHOU Weizheng2,3 YANG Kunguang2,3.Study on the Stress Characteristics of the Mid-pillar in the Expansion of an Existing Tunnel into a Double-arch Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 130-138
[11] YUE Hongwu1 MIAO Miao2.Analysis on Pre-grouting Reinforcement Effect of Pipe Roofs for the Shallowburied Mined Tunnel in Soft Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 111-117
[12] WU Hongyu1,2 LU Junfu1 PEI Qifan1.Experimental Analysis on Mechanical Behaviors of the Nodular Cast IronReinforced Concrete Composite Tunnel Liner Slab under Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 127-133
[13] ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2.Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 85-90
[14] TIAN Zhiyu1 TIAN Shangzhi1 YANG Feng1 ZHANG Zhaojie1 WANG Bo2.Engineering Measures and Safety Evaluation of Baizhang Tunnel Passing through Flow Plastic Water-rich Fracture Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(2): 176-183
[15] AN Guanfeng1,2 WANG Tan1,2 SI Haifeng1,2 LIU Tianjun1,2.Influence of Construction Sequence and Different Types of Pipes on Ground Surface Settlement Caused by the Construction of Two-layer Jacking-pipes[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 119-126
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY