Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes
(1. Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092; 2. Shanghai Municipal Engineering Design Institute (Group) Co., Ltd., Shanghai 200092)
Download: PDF (3030KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The excavation construction of large-diameter shield tunnels would cause disturbance to the soils, result? ing in ground settlement or heave, and thus bringing serious threats to the structural safety of the building complexes above. Based on a large-diameter shield tunnel passing under a dense group of building complexes in an old neighborhood, this paper first calculates the settlement deformation of the houses on key sections through 2D finite element software, and then compares the calculation results with those through 3D finite element software to analyze the applicability of the two calculation methods. Subsequently, on the basis of the 3D model, it studies the effects of different initial load release rates on the ground surface and house deformation caused by the shield tunnel construction. Finally, by using the theoretical ground settlement data calculated by the Peck formula, it sorts out the internal correlation among the initial load release rate, the ground settlement, and the ground loss rate, and puts forward relevant measures to control deformation. The research results show that the smaller the initial load release rate is, the smaller the ground surface and house settlement as well as corresponding ground loss will be. In terms of ground deformation control, the reduction of the load release rate is equivalent to decreasing the ground loss rate, and the decreasing amounts of initial load release rate, ground settlement, and ground loss rate are in a linear correlation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SUN Shuangchi1
2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1
KeywordsLarge-diameter   Shield tunnel   Control measure   Numerical analysis   Shield tunnels passing under building complexes   Load release rate     
Abstract: The excavation construction of large-diameter shield tunnels would cause disturbance to the soils, result? ing in ground settlement or heave, and thus bringing serious threats to the structural safety of the building complexes above. Based on a large-diameter shield tunnel passing under a dense group of building complexes in an old neighborhood, this paper first calculates the settlement deformation of the houses on key sections through 2D finite element software, and then compares the calculation results with those through 3D finite element software to analyze the applicability of the two calculation methods. Subsequently, on the basis of the 3D model, it studies the effects of different initial load release rates on the ground surface and house deformation caused by the shield tunnel construction. Finally, by using the theoretical ground settlement data calculated by the Peck formula, it sorts out the internal correlation among the initial load release rate, the ground settlement, and the ground loss rate, and puts forward relevant measures to control deformation. The research results show that the smaller the initial load release rate is, the smaller the ground surface and house settlement as well as corresponding ground loss will be. In terms of ground deformation control, the reduction of the load release rate is equivalent to decreasing the ground loss rate, and the decreasing amounts of initial load release rate, ground settlement, and ground loss rate are in a linear correlation.
KeywordsLarge-diameter,   Shield tunnel,   Control measure,   Numerical analysis,   Shield tunnels passing under building complexes,   Load release rate     
Cite this article:   
SUN Shuangchi1, 2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1 .Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 103-110
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I2/103
 
No references of article
[1] ZHU Meiheng1 CHEN Sirui2 HUANG Zhongkai2 LI Yongbo1 ZHANG Wuyu3 ZHANG Dongmei2.Study on the Deformation Law of Large-diameter Fully Prefabricated Assembled Shield Tunnels under Ground Surcharge[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 161-171
[2] GE Zhaoguo.Study on Impact Zoning Method and Zoning Control Technique for Construction of Large-diameter Shield Tunnel Adjacent to Viaduct Pile Foundation Group[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 276-289
[3] ZHANG Qing1 ZHEN Wenzhan1 FENG Kun2.Analysis of the Impact of Large Diameter Shield Tunnel Crossing Existing Expressway Bridge and Culvert[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 137-145
[4] HAO Pengfei.Study on Construction Quality Control Criteria for Prefabricated Integrated Arcuate Members[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 245-251
[5] HUANG Xuanbo1, 2 DING Wenqi1, 2 ZHANG Qingzhao1, 2.Numerical Analysis of Bending Mechanical Properties of Flange Joint of Corrugated Steel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 96-106
[6] ZHENG Zhenji1 HUANG Shuhua2 CHEN Xiangsheng1 ZHANG Liang2 LIU Haoming1 SHENG Jian2 SU Dong1.Analysis of Stress Characteristics of Specially Lined Segment of Superlargediameter Shield Main Tunnel during Mechanically Excavating Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 117-124
[7] DUAN Xianbiao1 HUANG Xuanbo2,3 ZHANG Qingzhao2,3 XU Yongjin1.Analysis of the Results of General Dewatering and Drainage Measures and Ground Stability of Tunnel in Water-rich Hypabyssal Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 146-155
[8] XUN Haolin1 LI Peinan2 LIU Jun1 SONG Xingbao3 QIN Yuan3 KOU Xiaoyong3 ZHAI Yixin3.Optimization and Application of Installation Path of Prefabricated Structure in Large-diameter Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 236-244
[9] FAN Wenhao1,2 XIE Shenghao1,2 ZHOU Feicong1,2 WANG Zhijie1,2 ZHANG Kai3 LUO Yunjian3.A Case Study on Adjacent Impact Zoning and Control Measures for New Double-line Shield Tunnel Undercrossing Existing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 43-57
[10] ZHAO Wanqiang1 LU Junfu2 TANG Yin1 ZHENG Changqing1.Study on Risk Level Classification Method and Control Measures for Railway Tunnel Floor Heave[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 178-187
[11] HAN Xiaoming1,2 HE Yuan1,2 ZHANG Feilei2,3,4.Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 227-235
[12] ZHU Caihui1,2 YING Li2 YANG Qiqiang2 LI Yubo3.A Study on Reduction Coefficient of External Hydraulic Pressure at the Lining of Diversion Tunnel in Saturated Q2 Loess Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 94-102
[13] CAO Xiangpeng1,2 FENG Kun2 XUE Haoyun2 MAO Sheng1 YU Bo2,3.Study on Transverse Seismic Performance of Double Lining of Large Diameter Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 130-139
[14] LIU Zonghan1,2 HAN Fenglei1,2 ZHANG Xuefu1,2 LI Hongliang3 QIN Zhen1,2 ZHAO Yicong1,2.Analysis on the Construction Hazard Causes of Tunnels with Altitude Difference in the Tilted Soft-hard Interbedded Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 197-207
[15] CUI Qinglong1 LI Jin1 GAO Binyong2 XIONG Xinyue2.Mechanical Properties of Three-inclined Bolts in Longitudinal Joint of Large-diameter Shield Tunnel Segment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 63-71