Research on the Technology for Monitoring and Controlling Blasting Vibration During Shallow Tunnel Excavation
(1 College of Architecture Engineering, Beijing University of Technology, Beijing 100124; 2 Beijing Municipal Road Engineering Quality Supervision Office, Beijing 100068)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Based on the blasting excavation of the Xisiduhe tunnel of the Huaichang Road reconstruction project, the technology for monitoring and controlling blasting-induced vibration during tunnel construction is addressed in this paper. By monitoring the particle vibration velocities on the ground surface and in the structure, the transmission law of the blasting vibration wave is studied and a spectral analysis is conducted. Finally, a rational controlling technology is presented. The results of monitoring analysis show that: (1) the magnitude of the particle blasting vibration velocity is closely related to the maximum explosive charge of each blasting and the distance between the monitoring points and the blasting center; (2) for left- and right-part blasting excavations on the lower bench, the larger the clamping force of the first blasting on the rocks, the bigger the blasting vibration response and the higher the vibration velocity. Because the first blasting offers a new free face to the second blasting, it can mitigate the blasting vibration effects and decrease the vibration velocity; (3) since the high-frequency components of the particle vibration velocity are not abundant, the dominant frequency of the vibration velocity is mainly distributed in low-frequency band; (4) because the air vents laid on the covered arch at the cut-and-cover section generate the reflecting action of a stress wave, the blasting vibration has a significant influence on the reinforced concrete covered-arch structure.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Gui-1
GAO Wen-Xue-1
LIU Dong-1
2
SHI Lian-Song-1
KeywordsShallow-buried tunnel   Blasting excavation   Vibration monitoring   Controlling technology     
Abstract: Based on the blasting excavation of the Xisiduhe tunnel of the Huaichang Road reconstruction project, the technology for monitoring and controlling blasting-induced vibration during tunnel construction is addressed in this paper. By monitoring the particle vibration velocities on the ground surface and in the structure, the transmission law of the blasting vibration wave is studied and a spectral analysis is conducted. Finally, a rational controlling technology is presented. The results of monitoring analysis show that: (1) the magnitude of the particle blasting vibration velocity is closely related to the maximum explosive charge of each blasting and the distance between the monitoring points and the blasting center; (2) for left- and right-part blasting excavations on the lower bench, the larger the clamping force of the first blasting on the rocks, the bigger the blasting vibration response and the higher the vibration velocity. Because the first blasting offers a new free face to the second blasting, it can mitigate the blasting vibration effects and decrease the vibration velocity; (3) since the high-frequency components of the particle vibration velocity are not abundant, the dominant frequency of the vibration velocity is mainly distributed in low-frequency band; (4) because the air vents laid on the covered arch at the cut-and-cover section generate the reflecting action of a stress wave, the blasting vibration has a significant influence on the reinforced concrete covered-arch structure.
KeywordsShallow-buried tunnel,   Blasting excavation,   Vibration monitoring,   Controlling technology     
published: 2014-08-10
Cite this article:   
CHEN Gui-1, GAO Wen-Xue-1, LIU Dong-1 etc .Research on the Technology for Monitoring and Controlling Blasting Vibration During Shallow Tunnel Excavation[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(5): 195-198
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I5/195
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY