Key Block Determination in the Progress of Design and Construction of the Diaoyutai Tunnel in Complex Surrounding Rock
(1 Jiangxi Provincial Key Laboratory of Digital Land Resources, East China Institute of Technology, Nanchang 330013; 2 College of Civil and Architectural Engineering, East China Institute of Technology, Nanchang 330013; 3 School of Resource & Civil Engineering, Northeastern University, Shenyang 110819)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The stability and safety of a jointed rock tunnel is controlled by key blocks to some extent. It is impor? tant to avoid engineering accidents by making sure that key blocks are determined in a timely manner in the progress of design and construction. Based on the block theory and in-site monitoring, and using the design and construction of the Diaoyutai tunnel as an example, unlocated blocks, located blocks and random blocks are searched for and determined by the self-developed GeoSMA- 3D system. The stability of the tunnel blocks is also studied.For studying the unlocated blocks, the theoretical calculation method for the possible maximum key block on the excavation face is determined for three structural planes. For studying the located blocks, the key block on the excavation face is sought based on information regarding deterministic structural planes. For the study of random blocks,the random structural planes are obtained by a three-dimensional contact-free measuring system. The finite blocks and key blocks are sought for under the interaction of deterministic structural planes and random structural planes. The three different kinds of block analysis method are inter-complementary, providing the basis for engineering design and construction from different aspects.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsThe maximum block   Located block   Random block   GeoSMA-3D   Surrounding rock     
Abstract: The stability and safety of a jointed rock tunnel is controlled by key blocks to some extent. It is impor? tant to avoid engineering accidents by making sure that key blocks are determined in a timely manner in the progress of design and construction. Based on the block theory and in-site monitoring, and using the design and construction of the Diaoyutai tunnel as an example, unlocated blocks, located blocks and random blocks are searched for and determined by the self-developed GeoSMA- 3D system. The stability of the tunnel blocks is also studied.For studying the unlocated blocks, the theoretical calculation method for the possible maximum key block on the excavation face is determined for three structural planes. For studying the located blocks, the key block on the excavation face is sought based on information regarding deterministic structural planes. For the study of random blocks,the random structural planes are obtained by a three-dimensional contact-free measuring system. The finite blocks and key blocks are sought for under the interaction of deterministic structural planes and random structural planes. The three different kinds of block analysis method are inter-complementary, providing the basis for engineering design and construction from different aspects.
KeywordsThe maximum block,   Located block,   Random block,   GeoSMA-3D,   Surrounding rock     
Cite this article:   
.Key Block Determination in the Progress of Design and Construction of the Diaoyutai Tunnel in Complex Surrounding Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(3): 105-111
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2017/V54/I3/105
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY