Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2017, Vol. 54 Issue (6) :187-194    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Modeling Technology and Stability Analysis of the Complex Bell-Shape Caverns
(1 Faculty of Geosciences and Environmental Engineering of Southwest Jiaotong University, Chengdu 610031; 2 State-Province Joint Engineering Laboratory of Spatial Information Technology for High-Speed Railway Safety, Chengdu 610031; 3 China Railway Academy Co. Ltd., Chengdu 610031)
Download: PDF (4239KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Three-dimensional modeling technology is key to the numerical analysis of the stability of large irregu? lar cavern groups using Flac3D. Based on the multiple soft coupling technique, the rapid modeling of the complex irregular caverns of Changyu in Wenling of the Zhejiang Province is realized by comprehensive use of AutoCAD, Surpac, Surfer and Matlab programs under the condition of only using the main parameters of the cavern structure, such as the topographic map, center coordinate of the cavern bottom, tunnel height and tunnel span. A model that is 624m long, 480 m wide, 336 m high and has 6 irregular caverns is modeled with 16 m, 8 m, 4 m, and 2 m sized grids.Under the accuracy requirements, the calculation is completed in only 2.5 hours, improving the calculation speed greatly. The calculation and analysis show the cavern group is stable, but the force state of the surrounding rock at the bottom and the central diaphragm wall is not conducive to stability. Traditionally, there are three kinds of measures for enhancing the stability of the cavern structure during cavern excavation: partial removal of the surrounding rock at the bottom, storing water in the rock pit and partial removal of the rock mass at the central diaphragm.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LUO Wen-Lin- 1
2 Han- Xuan- 2 Hou- Wei- 2 Zhou-Hong-Lei- 2
KeywordsBell-shaped caverns   Multiple software coupling modeling   Flac3D   Surpac     
Abstract: Three-dimensional modeling technology is key to the numerical analysis of the stability of large irregu? lar cavern groups using Flac3D. Based on the multiple soft coupling technique, the rapid modeling of the complex irregular caverns of Changyu in Wenling of the Zhejiang Province is realized by comprehensive use of AutoCAD, Surpac, Surfer and Matlab programs under the condition of only using the main parameters of the cavern structure, such as the topographic map, center coordinate of the cavern bottom, tunnel height and tunnel span. A model that is 624m long, 480 m wide, 336 m high and has 6 irregular caverns is modeled with 16 m, 8 m, 4 m, and 2 m sized grids.Under the accuracy requirements, the calculation is completed in only 2.5 hours, improving the calculation speed greatly. The calculation and analysis show the cavern group is stable, but the force state of the surrounding rock at the bottom and the central diaphragm wall is not conducive to stability. Traditionally, there are three kinds of measures for enhancing the stability of the cavern structure during cavern excavation: partial removal of the surrounding rock at the bottom, storing water in the rock pit and partial removal of the rock mass at the central diaphragm.
KeywordsBell-shaped caverns,   Multiple software coupling modeling,   Flac3D,   Surpac     
Cite this article:   
LUO Wen-Lin- 1, 2 Han- Xuan- 2 Hou- Wei- 2 Zhou-Hong-Lei- 2 .Modeling Technology and Stability Analysis of the Complex Bell-Shape Caverns[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(6): 187-194
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2017/V54/I6/187
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY