Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2017, Vol. 54 Issue (6) :210-216    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Control and Monitoring of Ground Deformation during Jacking of a Large-Diameter Curved Tabular Roof
(China Railway 18th Bureau Group Co. Ltd., Tianjin 300222)
Download: PDF (4014KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The bored section of the Gongbei Tunnel on the Zhuhai Link of the Hongkong-Zhuhai-Macao bridge passes beneath the Gongbei Port and is excavated using a combination of a curved tubular roof and artificial ground freezing. Due to the environmental sensitivity of the site, the complexity of the ground conditions and the special nature of the construction method, the ground deformation control during the construction of the curved tubular roof is challenging. Based on an analysis of the influential factors of ground deformation caused by tabular roof construction, countermeasures against ground deformation are proposed, including the selection of a proper jacking machine and its corollary equipment, the dynamic control of the jacking parameters, water leakage control at the entrance,launching and receiving process, pipe stiffness requirements, and a lubrication slurry replacement. In light of the ground deformation monitoring data, the law of ground deformation is analyzed in terms of the ground deformation,ground settlement trough and ground settlement accumulative effects, providing a basis for the construction safety and rationality as well as a reference for similar projects.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsHongkong-Zhuhai-Macao Bridge   Gongbei Tunnel   Curved tubular roof   Ground deformation control   Ground deformation monitoring     
Abstract: The bored section of the Gongbei Tunnel on the Zhuhai Link of the Hongkong-Zhuhai-Macao bridge passes beneath the Gongbei Port and is excavated using a combination of a curved tubular roof and artificial ground freezing. Due to the environmental sensitivity of the site, the complexity of the ground conditions and the special nature of the construction method, the ground deformation control during the construction of the curved tubular roof is challenging. Based on an analysis of the influential factors of ground deformation caused by tabular roof construction, countermeasures against ground deformation are proposed, including the selection of a proper jacking machine and its corollary equipment, the dynamic control of the jacking parameters, water leakage control at the entrance,launching and receiving process, pipe stiffness requirements, and a lubrication slurry replacement. In light of the ground deformation monitoring data, the law of ground deformation is analyzed in terms of the ground deformation,ground settlement trough and ground settlement accumulative effects, providing a basis for the construction safety and rationality as well as a reference for similar projects.
KeywordsHongkong-Zhuhai-Macao Bridge,   Gongbei Tunnel,   Curved tubular roof,   Ground deformation control,   Ground deformation monitoring     
Cite this article:   
.Control and Monitoring of Ground Deformation during Jacking of a Large-Diameter Curved Tabular Roof[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(6): 210-216
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2017/V54/I6/210
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY