Effects of Different Twin-Tunnel Excavation Overburdens on the Bearing Capacity of an Adjacent Pile Group
(1 Guangxi Road and Bridge Engineering Group Co. Ltd., Nanning 530011; 2 College of Civil Engineering and Architecture, Guangxi University, Nanning 530004; 3 Key Laboratory of Disaster Prevention and Structural Safety, Guangxi University, Nanning 530004;4 College of Civil and Architectural Engineering, Guangxi University of Science and Technology, Liuzhou 545006)
Download: PDF (3214KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The bearing capacity of a pile group is inevitably effected by adjacent tunnel excavation. In this paper a centrifugal model test is described, and a back analysis of the mechanical and physical parameters of soils is conducted regarding test results and based on the displacement control method (DCM) for the ground loss ratio. Further analysis on some typical cases is performed by numerical simulation with respect to different relative positions between the tunnel and pile group. Results show that twin-tunnel excavation has obvious effects on the pile top settlement if the pile groups are all above the tunnel sides: for instance, the pile top settlement can reach 5.51% dp (diameter of a single pile) when the ratio of the overlying overburden depth (C) and tunnel diameter (D) is 3.7. When the tunnel bottom is flush with the pile bottom, the bearing capacity of the pile group increases after twin-tunnel excavation compared to that of a tunnel within the scope of the pile body and at the bottom of the pile end. The load transfer mechanisms of various piles of the pile group are similar to those of the friction and end bearing pile when the tunnel axis is within the scope of the pile body, while it is similar to the end bearing friction pile when the tunnel axis is be? low the pile end.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsTwin tunnel   Centrifugal model test   DCM   Pile group     
Abstract: The bearing capacity of a pile group is inevitably effected by adjacent tunnel excavation. In this paper a centrifugal model test is described, and a back analysis of the mechanical and physical parameters of soils is conducted regarding test results and based on the displacement control method (DCM) for the ground loss ratio. Further analysis on some typical cases is performed by numerical simulation with respect to different relative positions between the tunnel and pile group. Results show that twin-tunnel excavation has obvious effects on the pile top settlement if the pile groups are all above the tunnel sides: for instance, the pile top settlement can reach 5.51% dp (diameter of a single pile) when the ratio of the overlying overburden depth (C) and tunnel diameter (D) is 3.7. When the tunnel bottom is flush with the pile bottom, the bearing capacity of the pile group increases after twin-tunnel excavation compared to that of a tunnel within the scope of the pile body and at the bottom of the pile end. The load transfer mechanisms of various piles of the pile group are similar to those of the friction and end bearing pile when the tunnel axis is within the scope of the pile body, while it is similar to the end bearing friction pile when the tunnel axis is be? low the pile end.
KeywordsTwin tunnel,   Centrifugal model test,   DCM,   Pile group     
Cite this article:   
.Effects of Different Twin-Tunnel Excavation Overburdens on the Bearing Capacity of an Adjacent Pile Group[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(1): 133-139
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2018/V55/I1/133
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY