Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2018, Vol. 55 Issue (2) :56-64    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Determination Method for a Reasonable Installation Time of the Tunnel′s Secondary Lining
(Hangzhou Company of China Railway Tunnel Group, Hangzhou 310000)
Download: PDF (2286KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The key to determine a reasonable installation time for a tunnel′s secondary lining is to evaluate when the deformation of the surrounding rock reaches a stable state. Site measured data contain the information about the development and evolution of the surrounding rock, which directly reflects the state of stress and deformation. In this context, a monitoring index based dynamic comprehensive evaluation model for the deformation state of surrounding rock is set up, which overcomes the defects of a traditional evaluation method that only takes static evaluation at a certain time node. In this new model, evaluation indices are weighted dynamically based on the principle of maximum deviations, for which the indices′weights vary with its stability in certain time domains, and the larger the deviations,the larger the weights. Furthermore, the status and the trend of the variation speed of monitoring indices are taken into consideration by introducing the concept of an acceleration correction coefficient. And such concepts as time weight vector and time degree are also introduced to make sure the collected monitoring data are weighted properly according to different acquisition times (the weights of recent monitoring data are higher than those of long term monitoring data). Finally, the feasibility of the model is verified by a test section in the Zizhi Tunnel in Hangzhou.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsTunnelling   Reasonable installation time of tunnel secondary lining   Monitoring and Measuring   Assess? ment of deformation conditions for tunnel surrounding rock     
Abstract: The key to determine a reasonable installation time for a tunnel′s secondary lining is to evaluate when the deformation of the surrounding rock reaches a stable state. Site measured data contain the information about the development and evolution of the surrounding rock, which directly reflects the state of stress and deformation. In this context, a monitoring index based dynamic comprehensive evaluation model for the deformation state of surrounding rock is set up, which overcomes the defects of a traditional evaluation method that only takes static evaluation at a certain time node. In this new model, evaluation indices are weighted dynamically based on the principle of maximum deviations, for which the indices′weights vary with its stability in certain time domains, and the larger the deviations,the larger the weights. Furthermore, the status and the trend of the variation speed of monitoring indices are taken into consideration by introducing the concept of an acceleration correction coefficient. And such concepts as time weight vector and time degree are also introduced to make sure the collected monitoring data are weighted properly according to different acquisition times (the weights of recent monitoring data are higher than those of long term monitoring data). Finally, the feasibility of the model is verified by a test section in the Zizhi Tunnel in Hangzhou.
KeywordsTunnelling,   Reasonable installation time of tunnel secondary lining,   Monitoring and Measuring,   Assess? ment of deformation conditions for tunnel surrounding rock     
Cite this article:   
.Determination Method for a Reasonable Installation Time of the Tunnel′s Secondary Lining[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(2): 56-64
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2018/V55/I2/56
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY