|
MODERN TUNNELLING TECHNOLOGY 2018, Vol. 55 Issue (3) :146-152 DOI: |
|
||||
| Mechanism of Tunnel Water Inflow Caused by Bending Failure of a Waterproof Dike Based on a Circular Thin Plate Mechanical Model | ||||
| (1 State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059; 2 College of Environment and Civil Engineering, Chengdu University of Technology, Chengdu 610059; 3 Sichuan Communications Investment Group Co. Ltd., Chengdu 610041; 4 China Academy of Safety Science and Technology, Beijing 100012) | ||||
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY
|