Abstract Improvements of management mode and application level of informationization techniques are the key factors to safe and efficient construction of the high-speed railway tunnels considering the complexity and diversity of construction techniques, unpredictable risk factors and varied geological conditions. In the paper it proposed a management mode for lean construction of high-speed railway tunnels, studied the in-depth integration and application of key technologies of BIM, advance geological prediction, tunnel surrounding rock measurement, 3D laser scanning, etc. in the lean construction management of high-speed railway tunnels, and developed the light portal APP and cloud-based information management system. Through the verification of practical engineering application, it realized good monitoring of key risk resources in tunnel construction, redline control for key tasks and effective management of safety and quality, increased efficiency of collaborative operation of all parties involved and reached the goal of lean construction and management.
Abstract:
Improvements of management mode and application level of informationization techniques are the key factors to safe and efficient construction of the high-speed railway tunnels considering the complexity and diversity of construction techniques, unpredictable risk factors and varied geological conditions. In the paper it proposed a management mode for lean construction of high-speed railway tunnels, studied the in-depth integration and application of key technologies of BIM, advance geological prediction, tunnel surrounding rock measurement, 3D laser scanning, etc. in the lean construction management of high-speed railway tunnels, and developed the light portal APP and cloud-based information management system. Through the verification of practical engineering application, it realized good monitoring of key risk resources in tunnel construction, redline control for key tasks and effective management of safety and quality, increased efficiency of collaborative operation of all parties involved and reached the goal of lean construction and management.