Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2019, Vol. 56 Issue (1) :107-113    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
haking Table Test on Dynamic Damage Behaviors of a Circular Tunnel with Voids behind the Lining Subjected to Near-field Ground Motions
(1 School of Civil and Transportation Engineering, Hebei University of Technology,Tianjin 300401; 2 School of Transportation, Nantong University, Nantong 226019)
Download: PDF (2083KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Considering the effect of near-field ground motion, a shaking table model test was conducted to the cir? cular tunnel with voids behind the lining. A comparative analysis was taken with aspects of acceleration response of foundation field domain, dynamic earth pressure of soil-structure contact surface, acceleration response of tunnel structure and dynamic strain rules. Meanwhile, the effect of near field ground motion on dynamic damage behaviors of the tunnel structure was studied based on a damage model. The results show that: 1) there is slight difference in the acceleration response at the different cross sections of the circular tunnel in the process of seismic wave loading,and tunnel structure affects the peak acceleration of subsoil at two sides while the changes of spectrum characteristics are not obvious; 2) when the intensity of input near-field ground motion is small, the average peak acceleration at the cross section with top voids is also small but the average dynamic strain response is large while the average peak acceleration at the cross section with dense top is large but the average dynamic strain response is small; 3) the damage is most serious at the scope of ±30° of the top of the cross section with voids behind the lining, which agrees with the seismic damage of existing circular tunnel.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsCircular tunnel;Voids behind lining;Seismic response   Shaking table test;Dynamic damage     
Abstract: Considering the effect of near-field ground motion, a shaking table model test was conducted to the cir? cular tunnel with voids behind the lining. A comparative analysis was taken with aspects of acceleration response of foundation field domain, dynamic earth pressure of soil-structure contact surface, acceleration response of tunnel structure and dynamic strain rules. Meanwhile, the effect of near field ground motion on dynamic damage behaviors of the tunnel structure was studied based on a damage model. The results show that: 1) there is slight difference in the acceleration response at the different cross sections of the circular tunnel in the process of seismic wave loading,and tunnel structure affects the peak acceleration of subsoil at two sides while the changes of spectrum characteristics are not obvious; 2) when the intensity of input near-field ground motion is small, the average peak acceleration at the cross section with top voids is also small but the average dynamic strain response is large while the average peak acceleration at the cross section with dense top is large but the average dynamic strain response is small; 3) the damage is most serious at the scope of ±30° of the top of the cross section with voids behind the lining, which agrees with the seismic damage of existing circular tunnel.
KeywordsCircular tunnel;Voids behind lining;Seismic response,   Shaking table test;Dynamic damage     
Cite this article:   
.haking Table Test on Dynamic Damage Behaviors of a Circular Tunnel with Voids behind the Lining Subjected to Near-field Ground Motions[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(1): 107-113
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I1/107
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY