Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2019, Vol. 56 Issue (1) :205-208    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on Comprehensive Construction Technology for Retaining Structure of Special-shaped Deep Foundation Pit in Inclined Hard Rock
(1 Hebei Oriental College,Langfang 065001; 2 China Light Industry Construction Co., Ltd., Langfang 065001; 3 China Railway No. 3 Engineering Group Co. Ltd., Taiyuan 030001)
Download: PDF (1107KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Aiming at the construction difficulties and hole deviation issuses of diaphragm retaining wall and bored pile in inclined hard rocks, the corresponding construction techniques of hole drilled by rotary drilling rig and trough constructed by piling machine, and bored hole drilled by down-the-hole drill rig + rotary drilling rig were proposed based on a theoretical and practical research, by taking the retaining structure construction of a deep foundation pit of a metro station as an example. The results show that: (1) in the construction of diaphragm retaining structure in hard rock, main holes are constructed with intervals by rotary drilling rig, and accessory holes are constructed by piling machine, which improves the construction speed of retaining structure; (2) It is difficult to construct the bored pile in the hard rock, and the quincunx bores are drilled by down-the-hole drill rig and then followed by rotary drilling, which greatly increases the construction speed; (3) by adjusting the perpendicularity of the rotary drilling rig and the down-the -hole drill rig, the inclination of troughs and holes is avoided, guaranteeing the perpen? dicularity in the inclined rock mass; (4) the technical parameters of rotary drilling rig should be optimized to guarantee the perpendicularity during the rotary drilling construction in inclined hard rocks.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsHard rock stratum   Metro station   Foundation pit   Construction of diaphragm retaining structure   Con? struction of bored pile     
Abstract: Aiming at the construction difficulties and hole deviation issuses of diaphragm retaining wall and bored pile in inclined hard rocks, the corresponding construction techniques of hole drilled by rotary drilling rig and trough constructed by piling machine, and bored hole drilled by down-the-hole drill rig + rotary drilling rig were proposed based on a theoretical and practical research, by taking the retaining structure construction of a deep foundation pit of a metro station as an example. The results show that: (1) in the construction of diaphragm retaining structure in hard rock, main holes are constructed with intervals by rotary drilling rig, and accessory holes are constructed by piling machine, which improves the construction speed of retaining structure; (2) It is difficult to construct the bored pile in the hard rock, and the quincunx bores are drilled by down-the-hole drill rig and then followed by rotary drilling, which greatly increases the construction speed; (3) by adjusting the perpendicularity of the rotary drilling rig and the down-the -hole drill rig, the inclination of troughs and holes is avoided, guaranteeing the perpen? dicularity in the inclined rock mass; (4) the technical parameters of rotary drilling rig should be optimized to guarantee the perpendicularity during the rotary drilling construction in inclined hard rocks.
KeywordsHard rock stratum,   Metro station,   Foundation pit,   Construction of diaphragm retaining structure,   Con? struction of bored pile     
Cite this article:   
.Research on Comprehensive Construction Technology for Retaining Structure of Special-shaped Deep Foundation Pit in Inclined Hard Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(1): 205-208
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I1/205
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY