Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2019, Vol. 56 Issue (4) :74-80    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel
(1 School of Civil and Transportation Engineering, Ningbo University of Technology, Ningbo 315211; 2 The Soft Soil Research Center in Ningbo University of Technology, State Key Laboratory of Geomechanics and Geotechnical Engineering, Ningbo 315211; 3 School of Civil Engineering, Chongqing University, Chongqing 400045; 4 College of Civil Engineering and Architecture, Guangxi University,Nanning 530004)
Download: PDF (1266KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract With the construction of large-scale water conservancy projects in China, many deep-buried hydraulic pressure tunnels have been built. The principal stress of tunnel lining and surrounding rock will be changed under different conditions of construction and operation for the deep buried pressure tunnel. Based on D-P yield criterion,the elastoplastic solution of the deep-buried circular pressure tunnel was derived when the first principal stress is the radial stress or tangential stress under the condition of plane strain. The research shows that the calculated values by this model were consistent with the calculated values by M-C criterion, which verifies the correctness of this model and it is more conservative compared with the calculated results by M-C criterion; radiuses of plastic zones of lining and surrounding rock will change in different stresses levels and internal water pressures; plastic zone distribution can be divided into five stages and the yield radius of lining develops faster with an increase of internal water pressure during high water pressure stage.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Sui1
2
3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1
2
4 ZHAO Yongbo1
2 LI Zhantao1
2
KeywordsHydraulic tunnel   D-P criterion   Elastic-plastic solution   First principal stress   Deep buried depth   Lining under pressure   Circular tunnel     
Abstract: With the construction of large-scale water conservancy projects in China, many deep-buried hydraulic pressure tunnels have been built. The principal stress of tunnel lining and surrounding rock will be changed under different conditions of construction and operation for the deep buried pressure tunnel. Based on D-P yield criterion,the elastoplastic solution of the deep-buried circular pressure tunnel was derived when the first principal stress is the radial stress or tangential stress under the condition of plane strain. The research shows that the calculated values by this model were consistent with the calculated values by M-C criterion, which verifies the correctness of this model and it is more conservative compared with the calculated results by M-C criterion; radiuses of plastic zones of lining and surrounding rock will change in different stresses levels and internal water pressures; plastic zone distribution can be divided into five stages and the yield radius of lining develops faster with an increase of internal water pressure during high water pressure stage.
KeywordsHydraulic tunnel,   D-P criterion,   Elastic-plastic solution,   First principal stress,   Deep buried depth,   Lining under pressure,   Circular tunnel     
Cite this article:   
WANG Sui1, 2, 3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1 etc .D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(4): 74-80
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I4/74
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY