Study on the Construction Parameters of Shallow Buried Shield Tunnels under Bungalows in Water-rich Sand Stratum
(1 Municipal Engineering Co., Ltd. of China Railway 18 Bureau Group, Nanning 530000; 2 School of Mechanics and Civil Engineering,China University of Mining and Technology, Beijing 100083)
Download: PDF (3683KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Blow-out, large ground surface settlement, quick sand and so on are encountered during shield construc? tion in water-rich sand stratum, which will bring many problems and difficulties. It is extremely important to control the parameters of shield construction in water-rich sand stratum. Based on the practice of a running tunnel between Shuixi station and Changping station of Guangzhou metro line 21, an analysis on shield construction measures and parameters of the test section is conducted in light of the shield construction passing through water-rich sand stratum and underneath the bungalows with poor foundation in Shuixi village, and the parameters of shield construction are determined thereof. The monitoring results show that: the actual control values are close to the fitting values of analysis, the settlements of ground surface and building can be controlled within 5 mm and 10 mm respectively, and the correctness of the selected parameters is verified. The actual pressure in earth chamber is higher than the static earth pressure, the amount of simultaneous grouting shouldn′ t be less than 1.6 times of the theoretical value, increasing of earth pressure and thrust can effectively reduce settlement.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Qingzhang1 QI Weiqiang2 JIANG Yusheng2 ZHANG Changshu1 CHEN Xiafei1 LIU Rui1
KeywordsWater-rich sand stratum   Shield tunnel   Construction underneath Construction parameters   Grouting amount   Earth chamber pressure     
Abstract: Blow-out, large ground surface settlement, quick sand and so on are encountered during shield construc? tion in water-rich sand stratum, which will bring many problems and difficulties. It is extremely important to control the parameters of shield construction in water-rich sand stratum. Based on the practice of a running tunnel between Shuixi station and Changping station of Guangzhou metro line 21, an analysis on shield construction measures and parameters of the test section is conducted in light of the shield construction passing through water-rich sand stratum and underneath the bungalows with poor foundation in Shuixi village, and the parameters of shield construction are determined thereof. The monitoring results show that: the actual control values are close to the fitting values of analysis, the settlements of ground surface and building can be controlled within 5 mm and 10 mm respectively, and the correctness of the selected parameters is verified. The actual pressure in earth chamber is higher than the static earth pressure, the amount of simultaneous grouting shouldn′ t be less than 1.6 times of the theoretical value, increasing of earth pressure and thrust can effectively reduce settlement.
KeywordsWater-rich sand stratum,   Shield tunnel,   Construction underneath Construction parameters,   Grouting amount,   Earth chamber pressure     
Cite this article:   
CHEN Qingzhang1 QI Weiqiang2 JIANG Yusheng2 ZHANG Changshu1 CHEN Xiafei1 LIU Rui1 .Study on the Construction Parameters of Shallow Buried Shield Tunnels under Bungalows in Water-rich Sand Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(2): 169-175
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I2/169
 
No references of article
[1] MA Hui1 GAO Mingzhong2.Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 1-8
[2] WANG Mingnian1,2 GUO Xiaohan1,2 YU Li1,2 LI Chunhui1,2 CHEN Shuwang3.Study on the Location Selection of Emergency Rescue Station of the Extra-long Railway Tunnel at High Altitude[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 9-14
[3] LI Chang1,2 WANG Gang1,2 QIU Wenge1,2,3 GONG Lun1,2 ZHAO Yingchun4 WANG Qiuhui4.Research and Application of Support Resistant Limiting Dampers in the Tunnel with High Horizontal Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 15-29
[4] LIAO Jun1 DONG Qian1 LIANG Hongyong2 JIAN Bo2 SHI Yuchuan1,3 GONG Hongwei1.Preliminary Study on the Classification Indexes of Surrounding Rock for the Highway Tunnel in Nearly Horizontal Red-bed Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 25-29
[5] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[6] ZHONG Zuliang1,2 GAO Guofu1, 2 CHEN Peng1 YAN Ru1.Discussion on Design for the Liangjiang Ship Sightseeing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 36-42
[7] HUANG Fujie HE Zegan ZHANG Weimin LIU Shanshan.Application Research of BIM Technology in Engineering Design of the Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 43-48
[8] TANG Xiaosong1, 2 ZHENG Yingren3 WANG Yongfu1.Application of FEM Strength Reduction Method in Stability Analysis and Control of Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 49-55
[9] WU Bo1,2 LAN Yangbin1,2 YANG Shisheng1,2 YANG Jianxin3 PANG Xiaoyu3.Study on Stability of Surrounding Rock Based on Strength Reduction Dynamic Analysis Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 56-64
[10] ZHOU Cuiying1,2 LI Ang2,3 LIU Zhen1,2.Study on the Influence of Parallel Fold Structure on Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 65-74
[11] MA Li1 LIU Yapeng2 LI Sheng3,4 LV Wenda5 XIE Chao3,4 DAI Jinpeng3,4.Study on the Mechanical Behaviors of High-filled Loess Arched Open Cut Tunnel under Different Load Reduction Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 75-84
[12] ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2.Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 85-90
[13] SUI Xin1 ZHANG Zhengwei1 MING Xuan2 DOWNIE Steven3 PADHANI Shahid3 ZHAO Libo4.Numerical Simulation Analysis of SF6 Gas Leakage in Extra-Long GIL Utility Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 91-98
[14] ZHANG Kefeng.Numerical Simulation of Water Burst in Roadway Excavation with Karst Cave Ahead[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 99-107
[15] ZHANG Yan1, 2 WANG Wei2 DENG Xueqin2.Prediction Model of TBM Advance Rate Based on Relevance Vector Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 108-114
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY