Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (5) :167-172    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Experimental Study on Caulking Treatment Against Water Leakage in Shield Tunnel Segment Joints
(1 Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092; 2 Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education, Tongji University, Shanghai 200092; 3 CCCC Second Highway Consultants Co., Ltd., Wuhan 430056)
Download: PDF (2195KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To explore the effect and applicability of the caulking treatment measures against water leakage in shield tunnel segment joints, investigation and statistics are carried out on the segment water leakage conditions in a shield tunnel project in China. And with prepared concrete specimens the three-dimensional water pressure loading test system independently developed by Tongji University is used to carry out multiple sets of laboratory experimental study on the caulking and sealing method — the water leakage treatment measure actually used in the project.The results show that: (1) using the EPDM caulking and sealing gasket to treat the water leakage in segment joints, it can meet the requirements for Class I water-proofing. When the opening is 3 mm and the dislocation is 0 mm, it has a waterproof capacity of 0.38 MPa. When the dislocation is large, optimization design needs to be made for the section structure of the sealing gasket; (2) the sealing performance of the segment joint has obvious influence on the treatment effect of the caulking and sealing method, and water leakage is more likely to occur at positions where the caulking and sealing gasket is extruded out in the extrusion process and the sealing performance of the segment joint is poor.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Yi1
2 DING Wenqi1
2 YANG Linsong3 XIE Dongwu1
2
KeywordsShield tunnel   Segment joint   Water leakage   Caulking treatment   Waterproof test   EPDM sealing gas? ket     
Abstract: To explore the effect and applicability of the caulking treatment measures against water leakage in shield tunnel segment joints, investigation and statistics are carried out on the segment water leakage conditions in a shield tunnel project in China. And with prepared concrete specimens the three-dimensional water pressure loading test system independently developed by Tongji University is used to carry out multiple sets of laboratory experimental study on the caulking and sealing method — the water leakage treatment measure actually used in the project.The results show that: (1) using the EPDM caulking and sealing gasket to treat the water leakage in segment joints, it can meet the requirements for Class I water-proofing. When the opening is 3 mm and the dislocation is 0 mm, it has a waterproof capacity of 0.38 MPa. When the dislocation is large, optimization design needs to be made for the section structure of the sealing gasket; (2) the sealing performance of the segment joint has obvious influence on the treatment effect of the caulking and sealing method, and water leakage is more likely to occur at positions where the caulking and sealing gasket is extruded out in the extrusion process and the sealing performance of the segment joint is poor.
KeywordsShield tunnel,   Segment joint,   Water leakage,   Caulking treatment,   Waterproof test,   EPDM sealing gas? ket     
Cite this article:   
LI Yi1, 2 DING Wenqi1, 2 YANG Linsong3 XIE Dongwu1 etc .Experimental Study on Caulking Treatment Against Water Leakage in Shield Tunnel Segment Joints[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(5): 167-172
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I5/167
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY