Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (5) :96-103    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads
(1 School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 2 Academicians and Experts Workstation of Mine Safety and Underground Engineering, Inner Mongolia University of Science and Technology, Baotou 014010)
Download: PDF (2587KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract A rectangular pipe jacking machine is usually equipped with multiple cutterheads to cut and jack the soil mass on the excavation face by zoning. The torque setting parameters of cutterheads in different positions directly affect the excavation efficiency and safety of rectangular pipe jacking machines. Taking the pipe jacking construction of the Jingsan Road underground utility tunnel in Baotou as the engineering background, this paper uses various methods such as theoretical analysis and field measurement to study the changing pattern of the measured torques of cutterheads in different positions and the relevant torque settings during the jacking process. The conclusions are drawn as follows: the friction between the cutterhead and the soil mass mainly affects the torque of the cutterhead;the measured torque values of the cutterheads are close to the calculated values, and the former fluctuates dynamically with the jacking distance; the torques of three groups of cutterheads are of different values, of which the torque of the No.1 central large cutterhead in the first group is the largest, while that in the third group is the second and that in the second group is the smallest; the rated torque value of the No.1 central large cutterhead in the first group is about 1.36 times the measured torque value, while that of the small cutterheads in the second group is about 3.11 times the measured value, and that of the small cutterheads in the third group is about 2.8 times the measured value.The safety reserve setting of the rated torque value of the small cutterheads is quite high, and optimization could be achieved by appropriately reducing the rated torque value of the small cutterheads.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
XU Youjun1
2 HUANG Zhengdong1
2 ZHANG Xu1
2 ZHANG Chao1
2 KANG Jiawang1
2 ZHOU Wei1
KeywordsSubway   Rectangular EPB pipe jacking machine   Theoretical analysis   Torque setting   Measured torque     
Abstract: A rectangular pipe jacking machine is usually equipped with multiple cutterheads to cut and jack the soil mass on the excavation face by zoning. The torque setting parameters of cutterheads in different positions directly affect the excavation efficiency and safety of rectangular pipe jacking machines. Taking the pipe jacking construction of the Jingsan Road underground utility tunnel in Baotou as the engineering background, this paper uses various methods such as theoretical analysis and field measurement to study the changing pattern of the measured torques of cutterheads in different positions and the relevant torque settings during the jacking process. The conclusions are drawn as follows: the friction between the cutterhead and the soil mass mainly affects the torque of the cutterhead;the measured torque values of the cutterheads are close to the calculated values, and the former fluctuates dynamically with the jacking distance; the torques of three groups of cutterheads are of different values, of which the torque of the No.1 central large cutterhead in the first group is the largest, while that in the third group is the second and that in the second group is the smallest; the rated torque value of the No.1 central large cutterhead in the first group is about 1.36 times the measured torque value, while that of the small cutterheads in the second group is about 3.11 times the measured value, and that of the small cutterheads in the third group is about 2.8 times the measured value.The safety reserve setting of the rated torque value of the small cutterheads is quite high, and optimization could be achieved by appropriately reducing the rated torque value of the small cutterheads.
KeywordsSubway,   Rectangular EPB pipe jacking machine,   Theoretical analysis,   Torque setting,   Measured torque     
Cite this article:   
XU Youjun1, 2 HUANG Zhengdong1, 2 ZHANG Xu1 etc .Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(5): 96-103
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I5/96
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY