Study on Engineering Influence of Defects in Pea Gravel Backfilling and Grouting Layer
(1 Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003; 2 State Key Laboratory of Geological Disaster Prevention and Geological Environment Protection, Chengdu University of Technology, Chengdu 610059)
Download: PDF (6226KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The pea gravel backfilling and grouting layer is an important part of the shield TBM tunnel lining system, and it is of great theoretical and practical significance in studying the impact of different defects in the pea gravel backfilling and grouting layer on construction works. In this paper, common defect types and its distribution law in the pea gravel backfilling and grouting layer are summarized on the basis of a diversion tunnel constructed by the double shield TBM. Then, the effects of different defect types on segment stress and displacement under different engineering conditions are systematically simulated and analyzed. The results show that common defect types mainly include cavity, non-dense grouting, plain cement and high rock powder content in cemented grouts; among others,cavity has the greatest impact, and the fully filling should be performed as much as possible; the vertical displacement of segments is sensitive to construction defects, the difference between horizontal and vertical displacements of segments might decrease under the action of internal water pressure in the pressurized tunnel; under the condition of Class Ⅱ surrounding rock, the influence of various defects is small, while that of other defects might be ignored ex? cept that cavity should be avoided as far as possible; in the Class Ⅳ surrounding rock the displacement and stress of segments are governed by the geological conditions, which would amplify the effect of defects, so that countermeasures should be taken accordingly; interaction of the internal water pressure and geological conditions would further amplify the influence of construction defects, the displacement of segments in Class Ⅳ surrounding rock is about 2~ 3 times of that in the Class Ⅱ surrounding rock, with especially prominent influence effect of cavity defect.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Jinliang1 HUANG Qiuxiang2 WANG Xueying1 HU Chao2 ZHANG Shaoxuan2
KeywordsShield TBM   Pea gravel backfilling and grouting layer   Segment lining   Construction defects   Hydraulic tunnel   Cavity   Non-dense grouting     
Abstract: The pea gravel backfilling and grouting layer is an important part of the shield TBM tunnel lining system, and it is of great theoretical and practical significance in studying the impact of different defects in the pea gravel backfilling and grouting layer on construction works. In this paper, common defect types and its distribution law in the pea gravel backfilling and grouting layer are summarized on the basis of a diversion tunnel constructed by the double shield TBM. Then, the effects of different defect types on segment stress and displacement under different engineering conditions are systematically simulated and analyzed. The results show that common defect types mainly include cavity, non-dense grouting, plain cement and high rock powder content in cemented grouts; among others,cavity has the greatest impact, and the fully filling should be performed as much as possible; the vertical displacement of segments is sensitive to construction defects, the difference between horizontal and vertical displacements of segments might decrease under the action of internal water pressure in the pressurized tunnel; under the condition of Class Ⅱ surrounding rock, the influence of various defects is small, while that of other defects might be ignored ex? cept that cavity should be avoided as far as possible; in the Class Ⅳ surrounding rock the displacement and stress of segments are governed by the geological conditions, which would amplify the effect of defects, so that countermeasures should be taken accordingly; interaction of the internal water pressure and geological conditions would further amplify the influence of construction defects, the displacement of segments in Class Ⅳ surrounding rock is about 2~ 3 times of that in the Class Ⅱ surrounding rock, with especially prominent influence effect of cavity defect.
KeywordsShield TBM,   Pea gravel backfilling and grouting layer,   Segment lining,   Construction defects,   Hydraulic tunnel,   Cavity,   Non-dense grouting     
Cite this article:   
ZHANG Jinliang1 HUANG Qiuxiang2 WANG Xueying1 HU Chao2 ZHANG Shaoxuan2 .Study on Engineering Influence of Defects in Pea Gravel Backfilling and Grouting Layer[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 163-172
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I6/163
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY