Study on Thermal Stress Field and Cracking Control of Cast-in-situ Mass Concrete in a Box Tunnel
(1 Chongqing Jiaotong University, Chongqing 400074; 2 Key Municipal Laboratory of Chongqing Colleges for Geological Disaster Reduction in Highway and Water Transportation in Mountainous Areas, Chongqing 400074)
Download: PDF (4124KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Cracking in mass concrete has always been an urgent research topic in the engineering field. So, in this paper, taking the cast-in-situ mass concrete of a multi-span multi-arch box tunnel in the Mountain Restoration Project in Xuzhou City, Jiangsu Province as the research background, temperature monitoring points are installed and the temperature at each monitoring point is measured during the pouring process of mass concrete, and then the secondary development function of ABAQUS finite element software is adopted to establish a finite element model of the single span tunnel, so as to simulate the thermal stress field of the mass concrete. Meanwhile, taking into consideration of the variations of concrete molding temperature, curing temperature, formwork removal time, pouring layer and so on, it analyzes the peak temperature at the center point, the maximum temperature difference between the core and surface as well as the surface tensile stress of the mass concrete in the tunnel. Finally, the variation law is concluded for thermal stress field of cast-in-situ mass concrete in the tunnel. The results show that: the variation law of the simulated temperature is basically consistent with the one measured on the site; when the concrete molding temperature and curing temperature increase by 20 ℃ , the peak temperature at the central point increases by 8.47 ℃ and 10.48 ℃, respectively, the maximum temperature difference between the core and surface increases by 6.35 ℃ or decreases by 6.79 ℃, respectively, and the tensile stress on the surface increases by 0.61 MPa or decreases by 0.52 MPa, respectively; Formwork removal and curing should be carried out about 3 days after pouring (when the concrete began to cool down) to minimize the peak temperature at the central point, the maximum temperature difference on inner surface and the tensile stress on the surface; the appropriate number of pouring layers is also conducive to the cracking control of the mass concrete. The on-site cracking control measures formulated according to the simulation results could effectively control the cracks of concrete structure and achieve good practical results.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
FU Yifan1
2 WANG Linfeng1
2 CHENG Ping1
2 TANG Ning1
2 ZHOU Nan1
2
KeywordsBox tunnel   Cast-in-situ mass concrete   ABAQUS secondary development   Thermal stress field   Analy? sis of influencing factors   Crack control     
Abstract: Cracking in mass concrete has always been an urgent research topic in the engineering field. So, in this paper, taking the cast-in-situ mass concrete of a multi-span multi-arch box tunnel in the Mountain Restoration Project in Xuzhou City, Jiangsu Province as the research background, temperature monitoring points are installed and the temperature at each monitoring point is measured during the pouring process of mass concrete, and then the secondary development function of ABAQUS finite element software is adopted to establish a finite element model of the single span tunnel, so as to simulate the thermal stress field of the mass concrete. Meanwhile, taking into consideration of the variations of concrete molding temperature, curing temperature, formwork removal time, pouring layer and so on, it analyzes the peak temperature at the center point, the maximum temperature difference between the core and surface as well as the surface tensile stress of the mass concrete in the tunnel. Finally, the variation law is concluded for thermal stress field of cast-in-situ mass concrete in the tunnel. The results show that: the variation law of the simulated temperature is basically consistent with the one measured on the site; when the concrete molding temperature and curing temperature increase by 20 ℃ , the peak temperature at the central point increases by 8.47 ℃ and 10.48 ℃, respectively, the maximum temperature difference between the core and surface increases by 6.35 ℃ or decreases by 6.79 ℃, respectively, and the tensile stress on the surface increases by 0.61 MPa or decreases by 0.52 MPa, respectively; Formwork removal and curing should be carried out about 3 days after pouring (when the concrete began to cool down) to minimize the peak temperature at the central point, the maximum temperature difference on inner surface and the tensile stress on the surface; the appropriate number of pouring layers is also conducive to the cracking control of the mass concrete. The on-site cracking control measures formulated according to the simulation results could effectively control the cracks of concrete structure and achieve good practical results.
KeywordsBox tunnel,   Cast-in-situ mass concrete,   ABAQUS secondary development,   Thermal stress field,   Analy? sis of influencing factors,   Crack control     
Cite this article:   
FU Yifan1, 2 WANG Linfeng1, 2 CHENG Ping1 etc .Study on Thermal Stress Field and Cracking Control of Cast-in-situ Mass Concrete in a Box Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 173-181
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I6/173
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY