Research on Machinery Matching Design and Process Standardization Control in Tunnelling by Drilling and Blasting Method
(China Railway City Development and Investment Group Co. Ltd., Chengdu 610218)
Download: PDF (1604KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to solve the problems of low mechanization level, high labor intensity and slow construction progress in tunnelling by conventional drilling and blasting method, taking Feieshan tunnel on Yibin-Yiliang expressway as the engineering background, the detailed analysis is carried out from the aspects of construction organization scheme, mechanized equipment operation matching method, construction process standardization management, etc., and the machinery matching technology and process standardization control scheme are put forward,which are suitable for tunnelling by drilling and blasting method. The actual construction effects show that, compared with the conventional drilling and blasting method, using the machinery matching technology it can greatly improve the construction progress, reduce the production cost and lower the construction risk; and by implementing process standardization control it can significantly shorten the time required for each process. In the construction of Grade Ⅳ and Grade Ⅴ surrounding rock sections of Feieshan tunnel, by means of machinery matching design and process standardization control it can save 23.85 h and 27.5 h per cycle respectively compared with the traditional construction technology, achieving good social and economic benefits, and realizing the rapid and safe construction of Feieshan tunnel.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Wulun JIANG Zhengquan
KeywordsHighway tunnel   Drilling and blasting construction method   Construction machinery matching   Process standardization     
Abstract: In order to solve the problems of low mechanization level, high labor intensity and slow construction progress in tunnelling by conventional drilling and blasting method, taking Feieshan tunnel on Yibin-Yiliang expressway as the engineering background, the detailed analysis is carried out from the aspects of construction organization scheme, mechanized equipment operation matching method, construction process standardization management, etc., and the machinery matching technology and process standardization control scheme are put forward,which are suitable for tunnelling by drilling and blasting method. The actual construction effects show that, compared with the conventional drilling and blasting method, using the machinery matching technology it can greatly improve the construction progress, reduce the production cost and lower the construction risk; and by implementing process standardization control it can significantly shorten the time required for each process. In the construction of Grade Ⅳ and Grade Ⅴ surrounding rock sections of Feieshan tunnel, by means of machinery matching design and process standardization control it can save 23.85 h and 27.5 h per cycle respectively compared with the traditional construction technology, achieving good social and economic benefits, and realizing the rapid and safe construction of Feieshan tunnel.
KeywordsHighway tunnel,   Drilling and blasting construction method,   Construction machinery matching,   Process standardization     
Cite this article:   
LI Wulun JIANG Zhengquan .Research on Machinery Matching Design and Process Standardization Control in Tunnelling by Drilling and Blasting Method[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 210-217
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I6/210
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY