Key Technologies in the Design of the Xiangyang Hanjiang Immersed Tube Tunnel
(CCCC Highway Consultants Co., Ltd., Beijing 100088)
Download: PDF (5901KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Based on the engineering design practice of the Xiangyang Hanjiang Immersed Tube Tunnel, and in view of the tunnel characteristics, such as strong scouring, deep and thick highly-permeable ground and high requirement for flood control, this paper investigates the various aspects in terms of the tunnel design, including the horizontal-and longitudinal layout of the tunnel, the tunnel element structure and water-stopping structure of the joints, the type and structure of the dry dock, foundation and backfilling of the immersed tube tunnel, final closure joint structure and water-stopping structure of the connection ends. The results show that: (1) for the inland river immersed tube tunnel, the arrangement scheme of long-distance dual-axis dry dock is adopted, and the support and water isolation problems of the deep foundation in highly permeable strata are solved through a combination of technologies,such as lattice underground diaphragm wall, ultra-deep closed curtain, underground diaphragm wall with prestressed anchor cables and concrete sealing bottom; (2) the full-face continuous casting technology is used to prefabricate monolithic elements, and the independently developed water stop profiles are first used for the element joints;(3) for the inland river immersed tube tunnel, a high-precision floating leveling barge is used for pre-paving the peb? ble foundation, and the anti-scouring solution is provided for the top of the elements in strong scouring areas; (4) the land final joint without independent thrust structure is used, and at the connection end the support structure composed of large diameter interlocked steel pipe piles and outside water-stopping wall as well as the secondary waterstopping structure composed of piece-by piece hoisted double-wall steel cofferdam are installed according the project demand.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Yong XU Guoping LI Yong LIU Minghu REN Yaopu XU Yu FAN Zhe
KeywordsInland river immersed tube tunnel   Design   Strong scouring   Sandy pebbles     
Abstract: Based on the engineering design practice of the Xiangyang Hanjiang Immersed Tube Tunnel, and in view of the tunnel characteristics, such as strong scouring, deep and thick highly-permeable ground and high requirement for flood control, this paper investigates the various aspects in terms of the tunnel design, including the horizontal-and longitudinal layout of the tunnel, the tunnel element structure and water-stopping structure of the joints, the type and structure of the dry dock, foundation and backfilling of the immersed tube tunnel, final closure joint structure and water-stopping structure of the connection ends. The results show that: (1) for the inland river immersed tube tunnel, the arrangement scheme of long-distance dual-axis dry dock is adopted, and the support and water isolation problems of the deep foundation in highly permeable strata are solved through a combination of technologies,such as lattice underground diaphragm wall, ultra-deep closed curtain, underground diaphragm wall with prestressed anchor cables and concrete sealing bottom; (2) the full-face continuous casting technology is used to prefabricate monolithic elements, and the independently developed water stop profiles are first used for the element joints;(3) for the inland river immersed tube tunnel, a high-precision floating leveling barge is used for pre-paving the peb? ble foundation, and the anti-scouring solution is provided for the top of the elements in strong scouring areas; (4) the land final joint without independent thrust structure is used, and at the connection end the support structure composed of large diameter interlocked steel pipe piles and outside water-stopping wall as well as the secondary waterstopping structure composed of piece-by piece hoisted double-wall steel cofferdam are installed according the project demand.
KeywordsInland river immersed tube tunnel,   Design,   Strong scouring,   Sandy pebbles     
Cite this article:   
WANG Yong XU Guoping LI Yong LIU Minghu REN Yaopu XU Yu FAN Zhe .Key Technologies in the Design of the Xiangyang Hanjiang Immersed Tube Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 192-199
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I2/192
 
No references of article
[1] ZHONG Wulin1 HAN Xingbo1 YE Fei1 WANG Han1 CAO Xiaoyong2 XI Weizheng2.Research on Wind Resistance and Optimization Design of Steel Corrugated Plate Support for Tunnel Shafts[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 197-207
[2] LIU Liying1 WEI Lixin1 YU Zhiyuan2 YANG Xudong3 YE Tingting1.Key Construction Technologies for the Ruyifang Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 259-272
[3] LI Qiang1 HAN Xingbo2 XIE Ju1 LI Chao3 LI Xing3 MA Aihua1 BI Jiefu3 YE Fei.Tunnel Energy Supply Strategy and Practice with Grid-Connected PV-Storage Microgrid: A Case Study of the Wudingguan Tunnel Photovoltaic Power Station Project[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 60-66
[4] ZHENG Tengyue1 WANG Shuying1,2 YUAN Xiao1.Optimization of Construction Parameters for Shield Tunnels Undercrossing Existing Lines Based on Numerical Simulation and Machine Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 100-107
[5] WANG Zhilong1,2,3,4 WANG Mingnian2,3,4 ZHANG Xiao2,3,4 TONG Jianjun2,3,4 LIU Dagang2,3,4.Study on Mechanical Behaviors and Spatiotemporal Effects in Mechanized Large-section Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 229-239
[6] YAO Zhixiong1,2 HE Jiawei1 ZHENG Guowen3 ZHOU Qichuang1 SHI Linxin1 GAO Xiaoming4 YANG Yawei4.Analysis of the Load Bearing Mechanism and Mechanical Properties of the Advanced Pipe Roof and Discussion on Its Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 60-70
[7] ZHANG Xinyang1, 2 SHEN Yusheng1, 2 CHANG Mingyu1, 2 WANG Haokang1, 2 PAN Xiaohai1, 2 WANG Yanyan1, 2.Mix Proportion Design of Similar Materials for Tunnel Surrounding Rocks Based on GA-BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 82-91
[8] ZHOU Xiaojun.On Segmenting Design Method of Prefabricated Assembled Secondary Lining for High-speed Railway Tunnels Based on Cross-section Geometric Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 232-243
[9] XU Peng1 MA Zhenshuo1 WU Yimin2 WANG Zijian2 LIANG Weiming2.Discussion on Operation Ventilation Design for the Super-long Subsea Tunnel of the Bohai Strait Channel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 45-52
[10] YU Yu QI Chun YANG Jianmin LUO Lusen.Progress and Prospect of Loess Tunnel Construction Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 80-89
[11] ZHU Hehua1,2 LING Jiaxin1 ZHU Mengqi1 LI Xiaojun1,2 WU Wei1,2.Intelligent Construction for Drill-and-Blast Tunnels: Latest Technologies and Future Prospects[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 18-27
[12] ZHAO Yong1 WANG Mingnian2,3 YU Li2,3 ZHANG Xiao2,3.Development and Prospect of Tunnel Support Structure Design Theory and Method in China[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 28-42
[13] LI Yuwen WEI Yanqing.Key Technologies for Design and Construction of the Daliangshan No.1 Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 232-240
[14] SHEN Zhijun1,2 YAO Zhiwen1 ZHENG Yuchao1 QIU Wenge1 AI Xufeng1.Key Technologies for Design and Construction of Horseshoe-Shaped Shield Used in Baicheng Tunnel on Menghua Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 254-262
[15] YANG Chunshan1 YANG Xueqiang2 WANG Yatian2 LIN Yonggui1.Optimization of the Design and Construction Scheme of Tunnel Entry and Conver? sion System for Removal of Anti-slide Pile in Architecturally Sensitive Area[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 220-227
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY