Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2024, Vol. 61 Issue (4) :232-243    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
On Segmenting Design Method of Prefabricated Assembled Secondary Lining for High-speed Railway Tunnels Based on Cross-section Geometric Parameters
(School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (6102KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Based on the technical indicators of the construction clearance and inner lining profile for single-tube double-track high-speed railway tunnels with design speeds of 300-350 km/h, a design method for segmenting prefabricated assembled secondary lining blocks in drill and blast tunnels is analyzed and proposed. Calculation formulas for determining the geometric parameters of prefabricated assembled secondary lining blocks are presented and verified with examples. Additionally, the assembly methods of prefabricated secondary lining blocks with straight joint and staggered joint high-speed railway tunnels are proposed.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHOU Xiaojun
KeywordsHigh-speed railway tunnel   Prefabricated assembled secondary lining   Geometric parameters   Design method   Assembly method     
Abstract: Based on the technical indicators of the construction clearance and inner lining profile for single-tube double-track high-speed railway tunnels with design speeds of 300-350 km/h, a design method for segmenting prefabricated assembled secondary lining blocks in drill and blast tunnels is analyzed and proposed. Calculation formulas for determining the geometric parameters of prefabricated assembled secondary lining blocks are presented and verified with examples. Additionally, the assembly methods of prefabricated secondary lining blocks with straight joint and staggered joint high-speed railway tunnels are proposed.
KeywordsHigh-speed railway tunnel,   Prefabricated assembled secondary lining,   Geometric parameters,   Design method,   Assembly method     
Cite this article:   
ZHOU Xiaojun .On Segmenting Design Method of Prefabricated Assembled Secondary Lining for High-speed Railway Tunnels Based on Cross-section Geometric Parameters[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(4): 232-243
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2024/V61/I4/232
 
No references of article
[1] ZHANG Yujin ZHOU Xiaojun YU Bingxin LI Xu ZHANG Chao.Study on the Partitioning Method for Prefabricated Secondary Lining in Conventional Tunnelling Based on the "Contact Friction-Beam-Joint" Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 35-44
[2] YU Yu QI Chun YANG Jianmin LUO Lusen.Progress and Prospect of Loess Tunnel Construction Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 80-89
[3] ZHAO Yong1 WANG Mingnian2,3 YU Li2,3 ZHANG Xiao2,3.Development and Prospect of Tunnel Support Structure Design Theory and Method in China[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 28-42
[4] ZHOU Xiaojun1 NING Yuansi2 YANG Changyu3.Design and Engineering Application of Prefabricated Structure for Secondary Lining Arch of Double-Track Railway Tunnels Constructed by the Mining Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 204-217
[5] YAO Jie1,2.Analysis on Factors Influencing the Pneumatic Load during Train Operation in High-speed Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 166-171
[6] CHEN Shaohua.Study on New Structural Type of the Emergency Rescue Station of Mabaishan Tunnel in Qinling Mountains[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 35-41
[7] ZHOU Xiaojun1 GUO Jian1 YANG Changyu2 QING Weichen2 XIONG Guoxing2 KUANG Wentao2.Study on the Partition Mode of Prefabricated and Assembled Secondary Lining of Double-track Railway Tunnels by Drilling and Blasting Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 46-58
[8] LI Linyi1 YANG Junsheng1 WANG Lichuan1,2 WANG Shuying1 FANG Xinghua1 XIE Yipeng1.Cause Analysis and Treatment Measures of the Inverted Arch Heaving Disease of a High-speed Railway Tunnel under Heavy Rainfall[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 27-36
[9] LIU Sicong1 ZHAO Chengqiao2 MA Chenxiao1 PENG Fangle.Discussion on Connection Problems of Underground Space in Early CBD from the Perspective of Urban Renewal ——A Case of Lujiazui CBD[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 77-83
[10] ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4.Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 91-97
[11] LI Qiang.Study on Cover-cut Method for the Super-Shallow High-speed Railway Tunnels beneath an Expressway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 161-166
[12] XIAN Zhengping.Structure Safety Analysis of a Newly Built Expressway Crossing over an Operating High-speed Railway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(2): 134-140
[13] HUANG Juan1 PENG Limin1 DING Zude2 LEI Mingfeng1.Analysis of the Vibration Responses of High-Speed Railway Tunnels Based on Damage Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 93-100
[14] WANG Shuaishuai GAO Bo LI Zhiye ZHANG Bohua.Calculation Methods for the Bearing Capacity of SFRC Underground Structure Members[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(5): 1-9
[15] Ding Zude1 Du Yonggang1 Peng Limin2 Shi Chenghua2 Huang Juan2.Influence of Tunnel Base Rock Mass Properties on the Dynamic Response of High-Speed Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(3): 88-94
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY