Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (4) :204-217    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Design and Engineering Application of Prefabricated Structure for Secondary Lining Arch of Double-Track Railway Tunnels Constructed by the Mining Method
 
(1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2. East Ring Line Construction Headquarters of Chongqing Railway Hub of China Railway Chengdu Bureau Group Co. Ltd., Chongqing 400023; 3. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031)
Download: PDF (5802KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Guide  
Abstract Tunnel construction through the mining method with cast-in-place concrete lining often fails to complete? ly eliminate common quality defects, such as insufficient thickness of concrete lining, insufficient strength, cracking and spalling, and void behind in tunnel arch, which poses threats to the long-term safe operation of railway tunnels.This paper relies on the Hujiagou Tunnel Project of the East Ring Line of Chongqing Railway Hub and proposes to use assembled secondary lining for the arch of the composite lining by combining prefabricated blocks and sidewall molded lining. This paper analyzes the blocking method and joint structure of the prefabricated lining in the arch,summarizes the construction process and economy of the prefabricated lining structure, and analyzes the safety and durability of the lining structure according to field monitoring results. The results show that the structural parameters of the initial support and assembled secondary lining designed for the prefabricated lining test section of the arch of the Hujiagou Tunnel are feasible, and the lining allows for sufficient safety; The form of joints for the prefab? ricated lining of the arch and the cast-in-place sidewall should be designed in the form of a circular arc; The total cost of the scheme of secondary lining with prefabricated arch increases by RMB 3,147,100 compared with the total cost of the cast-in-place secondary lining, and the comprehensive cost increases by RMB 28,600/m.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHOU Xiaojun1 NING Yuansi2 YANG Changyu3
KeywordsMining method   Double-line railway tunnel   Prefabricated blocks for arch   Structural design   Prefabri? cated secondary lining     
Abstract: Tunnel construction through the mining method with cast-in-place concrete lining often fails to complete? ly eliminate common quality defects, such as insufficient thickness of concrete lining, insufficient strength, cracking and spalling, and void behind in tunnel arch, which poses threats to the long-term safe operation of railway tunnels.This paper relies on the Hujiagou Tunnel Project of the East Ring Line of Chongqing Railway Hub and proposes to use assembled secondary lining for the arch of the composite lining by combining prefabricated blocks and sidewall molded lining. This paper analyzes the blocking method and joint structure of the prefabricated lining in the arch,summarizes the construction process and economy of the prefabricated lining structure, and analyzes the safety and durability of the lining structure according to field monitoring results. The results show that the structural parameters of the initial support and assembled secondary lining designed for the prefabricated lining test section of the arch of the Hujiagou Tunnel are feasible, and the lining allows for sufficient safety; The form of joints for the prefab? ricated lining of the arch and the cast-in-place sidewall should be designed in the form of a circular arc; The total cost of the scheme of secondary lining with prefabricated arch increases by RMB 3,147,100 compared with the total cost of the cast-in-place secondary lining, and the comprehensive cost increases by RMB 28,600/m.
KeywordsMining method,   Double-line railway tunnel,   Prefabricated blocks for arch,   Structural design,   Prefabri? cated secondary lining     
Fund: 
Cite this article:   
ZHOU Xiaojun1 NING Yuansi2 YANG Changyu3 .Design and Engineering Application of Prefabricated Structure for Secondary Lining Arch of Double-Track Railway Tunnels Constructed by the Mining Method[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(4): 204-217
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I4/204
 
No references of article
[1] WANG Jianyu.A Critical Reflection on Innovation Themes of Conventional Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 1-9
[2] ZHOU Xiaojun1 GUO Jian1 YANG Changyu2 QING Weichen2 XIONG Guoxing2 KUANG Wentao2.Study on the Partition Mode of Prefabricated and Assembled Secondary Lining of Double-track Railway Tunnels by Drilling and Blasting Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 46-58
[3] ZHANG Jinlong1 GOU Changfei2 YE Fei3.Structure Design and Parameter Analysis of a Large-section Sea-crossing Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(2): 61-67
[4] ZHANG Junru YE Lun YAN Congwen LIU Dingding CUI Yao FENG Jimeng.Study on the Influence of Approaching Construction of the Trailing Shielddriven Tunnel on the Large-section Mined Tunnel in Argillaceous Siltstone Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 122-132
[5] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 72-78
[6] WEI Gang1 XING Jianjian2 SU Qinwei3 LU Shijie2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 139-145
[7] LI Chunhui LI Hongzhou WU Yong LI Ronghua.Design and Development of a GIS-Based Management System for Tunnel Collapse Rescue[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 59-63
[8] LIN Yuexiang1 PENG Limin1 SHI Chenghua1 LEI Mingfeng1 FU Xiaokang2.Dynamic Response Characteristics and Reasonable Design Parameters for Railway Tunnel Floor Structures under Heavy Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 86-92
[9] LI Yan1 QI Taiyue1 LEI Bo1 WU Yubin2 TENG Zhennan1.Impact of Spatial Effects on the Structural Design of Subway Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(5): 138-144
[10] Hua Fucai.Prediction Analysis of Fissure Water in Metro Tunnels Based on Groundwater Dynamics[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 78-86
[11] CHEN Kui-1, 2 , Feng-Huan-Huan-2.Design Option for the Extra-Large Rail-and-Road Shield Tunnel on Sanyang Road in Wuhan [J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(4): 168-177
[12] ZHANG Xian-Feng.Key Points of the Design for Underwater Tunnels Using the Mined Method[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(2): 101-107
[13] Gou Mingzhong.Mechanical Analysis and Design of a Multi-Level Tunnel Group[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(2): 127-133
[14] .Physical and Mechanical Characteristics of Mixed Rock Eluvium and Its Effects on Metro Works and Treatment Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(1): 29-33
[15] ZHONG Chang-Ping-1,2,ZHOU Cui-Ying-1,XIE Xiao-Bing-2,ZHU Wei-Bin-3.Study of the Deformation Control of the Primary Support Structure of a Mined Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(4): 26-31
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY