|
2022, Vol. 59(4): 204-217 DOI: | ||
Design and Engineering Application of Prefabricated Structure for Secondary Lining Arch of Double-Track Railway Tunnels Constructed by the Mining Method | ||
(1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2. East Ring Line Construction Headquarters of Chongqing Railway Hub of China Railway Chengdu Bureau Group Co. Ltd., Chongqing 400023; 3. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|