Study and Application of Section Survey Technique of CPⅡ Network in Long and Large Tunnel
(Dongguan Rail Transit Co., Ltd., Dongguan 523073)
Download: PDF (3258KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to ensure the overlapping accuracy of the section CPⅡnetwork in the tunnel before breakthrough of the long and large tunnel, and improve the construction efficiency of the ballastless track, by taking the Anding tunnel on the Yuxi-Mohan railway as an example, the section survey technique of the CPⅡ control network in the tunnel before breakthrough of the long and large tunnel under complex conditions was studied, and a CPⅡnetwork survey 0method in the tunnel by using a crossing traverse network plus the free stationing was proposed. By strengthening the network shape strength and the accuracy of CPⅠ control network outside the tunnel and CPⅡ control network inside the tunnel, optimizing the distribution of CPⅡ points inside the tunnel and the adjustment calculation scheme, the compatibility of the construction traverse points under joint survey was analyzed, and a complete set of section survey technique of CPⅡ network inside the tunnel before breakthrough of the long and large tunnel was presented. The results show that the section survey method can not only ensure the accuracy of the CPⅡcontrol network in the tunnel, but also ensure the overlapping accuracy between the CPⅡ control networks surveyed section in the tunnel, it can also ensure the smooth overlapping of each section of ballastless track after the breakthrough of the tunnel.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Yanping
KeywordsLong and large tunnel   CPⅡ control network in the tunnel   Section survey   Overlapping accuracy   Cross? ing traverse network   Free stationing     
Abstract: In order to ensure the overlapping accuracy of the section CPⅡnetwork in the tunnel before breakthrough of the long and large tunnel, and improve the construction efficiency of the ballastless track, by taking the Anding tunnel on the Yuxi-Mohan railway as an example, the section survey technique of the CPⅡ control network in the tunnel before breakthrough of the long and large tunnel under complex conditions was studied, and a CPⅡnetwork survey 0method in the tunnel by using a crossing traverse network plus the free stationing was proposed. By strengthening the network shape strength and the accuracy of CPⅠ control network outside the tunnel and CPⅡ control network inside the tunnel, optimizing the distribution of CPⅡ points inside the tunnel and the adjustment calculation scheme, the compatibility of the construction traverse points under joint survey was analyzed, and a complete set of section survey technique of CPⅡ network inside the tunnel before breakthrough of the long and large tunnel was presented. The results show that the section survey method can not only ensure the accuracy of the CPⅡcontrol network in the tunnel, but also ensure the overlapping accuracy between the CPⅡ control networks surveyed section in the tunnel, it can also ensure the smooth overlapping of each section of ballastless track after the breakthrough of the tunnel.
KeywordsLong and large tunnel,   CPⅡ control network in the tunnel,   Section survey,   Overlapping accuracy,   Cross? ing traverse network,   Free stationing     
Cite this article:   
ZHANG Yanping .Study and Application of Section Survey Technique of CPⅡ Network in Long and Large Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(6): 224-231
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I6/224
 
No references of article
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY