Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (1) :76-89    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research & Development and Application Analysis of Risk Ranking Management and Control Platform for Shield Construction of Urban Underground Works
(1. Powerchina Huadong Engineering Corporation Limited, Hangzhou 310014; 2. Zhejiang Intelligent Transportation Engineering Technology Research Center, Hangzhou 310014; 3. Hangzhou Metro Group Co., Ltd., Hangzhou 310020; 4. Zhejiang Huadong Surveying, Mapping and Engineering Safety Technology Co., Ltd., Hangzhou 310014; 5. Zhejiang University City College,Hangzhou 310015; 6. Key Laboratory of Safe Construction and Intelligent Maintenance for Urban Shield Tunnels of Zhejiang Province,Hangzhou 310015)
Download: PDF (11812KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to effectively solve the problems of the high incidence of risk events and untimely early warning response in shield construction of urban underground works, based on the concept of risk ranking control and in combination with the research on the intelligent pre-alarm mechanism of shield tunneling parameters, a risk ranking control system platform for shield construction of urban underground works has been developed. The platform mainly includes a full-dimensional collection of shield tunneling equipment parameters and monitoring data, comprehensive information integration, GIS layer display, intelligent monitoring of shield tunneling parameters, intelligent collection of monitoring measurement data, risk prediction and early warning management, system management and other modules. It can realize the functions of intelligent early warning of shield tunneling data overrun, intelligent risk monitoring, dynamic management of construction risks and post-construction risk status control of formed tunnel structures. The development and application of the platform provide a reference example for effectively solving the current problems of difficult shield construction supervision and lagging risk response, as well as the construction of an information-based intelligent control platform for shield construction risks of various types of urban rail transit and large municipal projects in the current period.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Yesheng1
2 WU Yong1
2 ZHAO Liangyun3 LI Wei3 JIANG Yijie4 ZHAO Huan4 DING Zhi5
6
KeywordsUrban underground works   Shield construction   Risk management and control   Information system     
Abstract: In order to effectively solve the problems of the high incidence of risk events and untimely early warning response in shield construction of urban underground works, based on the concept of risk ranking control and in combination with the research on the intelligent pre-alarm mechanism of shield tunneling parameters, a risk ranking control system platform for shield construction of urban underground works has been developed. The platform mainly includes a full-dimensional collection of shield tunneling equipment parameters and monitoring data, comprehensive information integration, GIS layer display, intelligent monitoring of shield tunneling parameters, intelligent collection of monitoring measurement data, risk prediction and early warning management, system management and other modules. It can realize the functions of intelligent early warning of shield tunneling data overrun, intelligent risk monitoring, dynamic management of construction risks and post-construction risk status control of formed tunnel structures. The development and application of the platform provide a reference example for effectively solving the current problems of difficult shield construction supervision and lagging risk response, as well as the construction of an information-based intelligent control platform for shield construction risks of various types of urban rail transit and large municipal projects in the current period.
KeywordsUrban underground works,   Shield construction,   Risk management and control,   Information system     
Cite this article:   
WANG Yesheng1, 2 WU Yong1, 2 ZHAO Liangyun3 LI Wei3 JIANG Yijie4 ZHAO Huan4 DING Zhi5 etc .Research & Development and Application Analysis of Risk Ranking Management and Control Platform for Shield Construction of Urban Underground Works[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(1): 76-89
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I1/76
 
No references of article
[1] CHEN Ming1 ZHAO Dapeng2 ZHANG Jingxiang1 GAO Hui1 WANG Xing1 HAO Jianshuai3 FANG Kuizhen3.The Reuse and Performance Testing of Shield Tunnel Mucks in Synchronous Grouting Materials[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 248-258
[2] WANG Heng1 HU Jinjian2 SUN Chengguo1 ZHANG Jian2 LIANG Yu3,4 FENG Tugen2.Study on Grouped Prediction of Shield Posture Based on EMD-GRU Model with Fixed Component Number[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 132-140
[3] CHEN Youjian.Visualization Simulation and Early Warning System for Shield Tunnelling Based on Digital Geological Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 166-174
[4] CHEN Yifan1 HUANG Shuhua2 SHEN Xiang1, 3, 4 SHENG Jian2 CHEN Xiangsheng1, 3, 4 ZHANG Liang2.Analysis on the Vibration Influence on Upper Buildings Induced by Cutting of Pile Group by Extra-large-diameter Shield in Dense Urban Areas[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 266-275
[5] HU Min1,2 HU Xingchen1,2 SONG Yun3 QIANG Pei3.Design and Development of the Shield Construction Assistant Decision-making System Based on the Knowledge Graph[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 66-75
[6] HUANG Hui TANG Yongmao CAO Saisai.[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 234-239
[7] GAO Pengpeng1 XU Fang1 SONG Putao2 WANG Ningning3 ZHANG Wei4.Influence of High-performance Synchronous Grouting Material on Shield Construction Parameters in Water-rich Sand Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 244-250
[8] ZHANG Longguan1 LIU Suimei1 LI Kaifu1 XU Jin2,3,4 WANG Shengnan3,5 LI Qiang3.Prediction of Shield Construction Risks in Subway Tunnelling Based on Fault Tree and Bayesian Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 21-29
[9] WEI Gang1,2 ZHAO Deqianlin1 HUANG Rui1.A Review of Model Test Studies on the Impact of Shield Construction on Adjacent Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 1-8
[10] ZHANG Xun1 HE Xiongfei2,3.Study on the Effect of Foam Agent on the Main Tunnelling Parameters of Earth Pressure Balanced Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 176-181
[11] SHEN Xiang1 YUAN Dajun2 WU Jun3 FU Yanbin1.Analysis and Prediction of Driving Parameters of Shield Tunnelling in Complex Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 160-166
[12] LIAO KAI1 LI LIN2 WU JIAN1.Design and Implementation of the Tunnel Overbreak and Underbreak Detecting Information System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(2): 42-48
[13] YUAN Dongfeng1, 2 LI Fangzheng1, 2 ZHOU Yuliang1, 2 YUAN Hui1, 2 GAQ Xiaogeng1, 2 LIU Shujie1, 2.Horizontal Directional Drilling and Grouting Technique for the Shield Tunnel Passing beside Buildings in Water-rich Sand Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 154-159
[14] WANG Zhenyong1 DONG Zhenyong2 JIANG Yusheng1 DONG Linwei1 XIONG Yunchao1 YANG Jianan1.Formation Mechanism and Treatment Measures of Special Mud Cake for Shield Tunnelling in Sandy Cobble Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 175-181
[15] JI Chang1 WANG Li2.On Deformation Control for the Shield Passing through Old Embankment to Be Rebuilt in Soft Soil Area[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 108-117
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY