A Study on Control Size of Blast Muck for Vertical Shaft Construction Using the Raise-boring Method
(1. School of Highway, Chang′an University, Xi′an 710064; 2. CCCC First Highway Consulting Co., Ltd., Xi′an 710068)
Download: PDF (4742KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To address the problem of muck-induced blockage in the construction of vertical shafts through the raiseboring method, this paper uses the 3D discrete element simulation method to simulate the muck-dropping process in vertical shafts and pilot shafts. The results show that when the muck diameter is larger than 0.2 m, it is easy for the muck to block the shaft (v=0), and when the muck diameter is smaller than 0.2 m, the muck above the pilot shaft can be smoothly discharged to the pilot shaft, with part of the muck accumulated at the bottom of the shaft. Also, if the diameter of the pilot shaft increases from 1.5 m to 3 m, it can effectively expand the arching range of the muck in the shaft, speed up the muck-dropping speed in the shaft, reduce the probability of arching and blockage (v≈0), and improve the muck falling rate, while the pilot shaft encounters muck blockages several times, reducing the muck falling rate. When the muck size is larger than 0.3 m, it is easy for the muck to cause the blockage of the pilot shaft if the shaft diameter is 1.5 m. In a long pilot shaft, large-size muck with higher velocity will still block the pilot shaft under the arching effect.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Yao1 DONG Xing1 CAO Xiaoyong2 XU Ping2
KeywordsHighway tunnel   Vertical shaft   Raise-boring method   Blast muck     
Abstract: To address the problem of muck-induced blockage in the construction of vertical shafts through the raiseboring method, this paper uses the 3D discrete element simulation method to simulate the muck-dropping process in vertical shafts and pilot shafts. The results show that when the muck diameter is larger than 0.2 m, it is easy for the muck to block the shaft (v=0), and when the muck diameter is smaller than 0.2 m, the muck above the pilot shaft can be smoothly discharged to the pilot shaft, with part of the muck accumulated at the bottom of the shaft. Also, if the diameter of the pilot shaft increases from 1.5 m to 3 m, it can effectively expand the arching range of the muck in the shaft, speed up the muck-dropping speed in the shaft, reduce the probability of arching and blockage (v≈0), and improve the muck falling rate, while the pilot shaft encounters muck blockages several times, reducing the muck falling rate. When the muck size is larger than 0.3 m, it is easy for the muck to cause the blockage of the pilot shaft if the shaft diameter is 1.5 m. In a long pilot shaft, large-size muck with higher velocity will still block the pilot shaft under the arching effect.
KeywordsHighway tunnel,   Vertical shaft,   Raise-boring method,   Blast muck     
Cite this article:   
LI Yao1 DONG Xing1 CAO Xiaoyong2 XU Ping2 .A Study on Control Size of Blast Muck for Vertical Shaft Construction Using the Raise-boring Method[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(2): 194-202
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I2/194
 
No references of article
[1] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[2] ZHONG Wulin1 HAN Xingbo1 YE Fei1 WANG Han1 CAO Xiaoyong2 XI Weizheng2.Research on Wind Resistance and Optimization Design of Steel Corrugated Plate Support for Tunnel Shafts[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 197-207
[3] LI Qiang1 HAN Xingbo2 XIE Ju1 LI Chao3 LI Xing3 MA Aihua1 BI Jiefu3 YE Fei.Tunnel Energy Supply Strategy and Practice with Grid-Connected PV-Storage Microgrid: A Case Study of the Wudingguan Tunnel Photovoltaic Power Station Project[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 60-66
[4] TANG Xie LIN Guojin1, 2 ZHANG Hang2.Adaptive Strategies for Mechanized Drill-and-Blast Construction in Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 217-228
[5] LIU Shangguo1 CI Naiquan1 LIU Rufei1 CHENG Kun2 WANG Fei1 MA Xinjiang3.Tunnel Crown Deformation Monitoring Method Based on Vehicle-mounted Laser Point Clouds[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 209-216
[6] CHEN Xiang1,2 LIN Zhi1,2 FENG Wanlin1,2 YANG Hongyun1,2.Experimental Study on Crack Propagation Characteristics and Mechanical Behavior of Plain Concrete Lining in Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 212-220
[7] BAI Zhongkun1,2 WANG Yawei1,2 BI Chengcheng1,2 ZHAO Xiuwang1,2 ZHU Qiang3.Design and Experimental Research on Segment Sealing Gasket of Vertical Shaft Using Upward Pipe Jacking Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 221-229
[8] TAN Yinjun1,2 WANG Keli1,2 ZHANG Heng1,2 ZHANG Zhiqiang1,2.Influence of Natural Wind on Fire Smoke Propagation in 10 km Long Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 103-113
[9] ZHANG Junwei1 YANG Zhe.Patterns and Distribution Characteristics of Shaft Construction Accidents in China (2003—2022)[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 1-8
[10] CHEN Jianxun1 WANG Heqi1, 2 JIA Haiyang1 LIU Weiwei1 LUO Yanbin1 ZHAO Zhiqiang1 HUANG Dengxia2.Testing and Analysis of Natural Ventilation in No. 1-2 Shaft in the Tianshan Shengli Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 219-23
[11] HE Shiyong1,2 TANG Huanhuan2 LIANG Bo1,2 SHI Lingna3 LI Jie2 LIU Hao2 WANG Xiaoyu2.Research Status and Progress of Linkage Theory and Technology of Ventilation and Lighting in Extra-long Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 28-40
[12] LIU Yuan1,2,3 YU Li1,2,3 WANG Xue1,2,3 GUO Xiaohan1,2,3 LU Ming1,2,3.Study on the Generation Mechanism of Non-exhaust Emissions from New Energy Vehicles and Its Impact on Air Demands in Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 41-50
[13] FENG Shouzhong1 ZHOU Long2 MAO Weixing1 LI Jie3 GAO Wei1.Experimental Study on the Impact of Side Wall Coating on Luminous Environment of Highway Tunnel and Visual Characteristics of Human Eyes[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 220-227
[14] WANG Mingnian1,2 DENG Tao3 YU Li1,2.Development and Prospects of Operation and Disaster Prevention Ventilation Technology in China′s Traffic Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 152-166
[15] LI Jianbin.Advances and Prospects of Tunnel Boring Machine Technology in China[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 178-189
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY