Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (4) :153-162    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Vibration Characterization Parameters of TBM Rock-breaking Cutterhead
(1. Key Laboratory of Urban Disaster Prevention and Mitigation of Ministry of Education, Beijing University of Technology,Beijing 100124; 2. China Construction Infrastructure Co., Ltd., Beijing 100037; 3. State Key Laboratory of Water and Sediment Science and Water Conservancy and Hydropower Engineering, Tsinghua University, Beijing 100084)
Download: PDF (4642KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract During the TBM rock breaking process, it is inevitable to generate strong vibration on the cutterhead. The vibration response of the cutterhead is the result of the interaction between rock and TBM, and it can serve as an important basis for rock mass identification and tunnelling parameter optimization. It is particularly important to obtain the information contained in this multi-source vibration signal of the cutterhead. Based on the TBM tunnelling test data, the influence of time on the distribution of vibration features is analyzed, a random forest model of multi-dimensional vibration features and tunnelling parameters is constructed, and the vibration features that can respond sensitively to changes in tunnelling parameters are screened through its feature importance evaluation function. The research results indicate that on-site vibration monitoring duration should reach at least one rotation period of the cutterhead, during which the distribution of various vibration characteristics tends to be stable. Peak factor and frequency standard deviation are the features that can best respond to changes in thrust and rotation speed, and can be used as key features for studying the relationship between vibration signal and change in tunnelling parameters.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Dongxin1 XIAO Yuhang2 ZHOU Xiaoxiong3 GONG Qiuming1 LIU Junhao1
KeywordsTBM   Cutter vibration response   Tunnelling test data   Signal processing   Vibration feature selection     
Abstract: During the TBM rock breaking process, it is inevitable to generate strong vibration on the cutterhead. The vibration response of the cutterhead is the result of the interaction between rock and TBM, and it can serve as an important basis for rock mass identification and tunnelling parameter optimization. It is particularly important to obtain the information contained in this multi-source vibration signal of the cutterhead. Based on the TBM tunnelling test data, the influence of time on the distribution of vibration features is analyzed, a random forest model of multi-dimensional vibration features and tunnelling parameters is constructed, and the vibration features that can respond sensitively to changes in tunnelling parameters are screened through its feature importance evaluation function. The research results indicate that on-site vibration monitoring duration should reach at least one rotation period of the cutterhead, during which the distribution of various vibration characteristics tends to be stable. Peak factor and frequency standard deviation are the features that can best respond to changes in thrust and rotation speed, and can be used as key features for studying the relationship between vibration signal and change in tunnelling parameters.
KeywordsTBM,   Cutter vibration response,   Tunnelling test data,   Signal processing,   Vibration feature selection     
Cite this article:   
LIU Dongxin1 XIAO Yuhang2 ZHOU Xiaoxiong3 GONG Qiuming1 LIU Junhao1 .Study on Vibration Characterization Parameters of TBM Rock-breaking Cutterhead[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(4): 153-162
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I4/153
 
No references of article
[1] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[2] GENG Qi XIE Weifeng YANG Mulin WANG Xuebin HUANG Yufeng LI Lei LI Xiaobin LI Zhibiao.Development of a Scaled Multifunctional TBM Rock-breaking Test Platform[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 208-218
[3] WANG Lichuan1,2 YAN Guangtian1 YUAN Wei GAO Hongbing4 LI Liping2 ZHANG Chunyu1,5 WU Jian4 ZHANG Long3.Development and Application of TBM-mounted Omni-directional and Normal Deep Anchor Hole Drilling Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 67-74
[4] ZHU Junlin1 ZHENG Mingming1, 2 PENG Linzhi ZHU Chengtao1 XIONG Liang1 ZHANG Yawei WU Zurui.Dynamic Response of Composite Support Structures Under Different Blasting Methods for TBM Breakout[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 117-125
[5] LI Jiuyuan1 GAO Fayong1 MA Yongtao1 TANG Mingyang2 FU Kang3 LI Yuheng2 XUE Yiguo2.Study on Surrounding Rock Identification and Excavation Speed Prediction in TBM Tunnels Based on the Interaction Mechanism of Rock-Machine Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 75-87
[6] JIA Lianhui1 ZHENG Wentao2 LU Yiqiang1 HE Fei1 SHANGGUAN Linjian2 ZHANG Yuxiang1.Force Analysis and Numerical Calculation Platform for Anti Back-sliding Device of TBM in Inclined Shafts[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 79-86
[7] ZHANG Guang1 GONG Qiuming1 XIE Xingfei1 PEI Chengyuan2 SHANG Ceng2.Interval Prediction of TBM Parameters in Stable Excavation Sections Based on Bootstrap-COA-BiGRU Model[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 121-131
[8] DONG Weijie1 ZHANG Siyang1 LI Bochang2 JIANG Yao1 CHEN Xu1 ZHENG Xiangle2 CHEN Sipan2 WU Di1.Study on TBM Jamming Problems in Jurassic and Cretaceous Argillaceous Sandstone Strata in Northern Xinjiang[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 151-161
[9] LIU Shaoqiang1 XU Jianshu2 YANG Xiu2 TANG Qisheng1 XIE Xingfei1 GONG Qiuming1 ZHOU Xiaoxiong3.TBM Cutter Edge Tip Wear Phenomenon and Wear Evolution Characteristics[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 20-27
[10] HUANG Dengxia1 LUO Yanbin2 ZHAO Zhiqiang2 CHEN Jianxun2 LIU Weiwei2 FENG Rubing1 WU Teligen1.Measurement and Analysis of Dust Concentration in Service Tunnel during Construction of Tianshan Shengli Tunnel with "TBM Method + Drill and Blast Method"[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 77-85
[11] ZHANG Yan HUO Tao ZHANG Zhongwei MA Chunming.TBM Muck Segmentation Method Based on Global Perception and Edge Refinement[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 141-147
[12] LI Jianbin.Advances and Prospects of Tunnel Boring Machine Technology in China[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 178-189
[13] LI Zongping1 WANG Shuaishuai2,4 MAO Jinbo3 LI Yalong3 NIU Xiaoyu2,4.Key Technological Innovation and Application in the Construction of Tianshan Shengli Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 241-253
[14] LIU Xiaoxuan1 TANG Xiao1 ZHANG Shuai1 TAN Zhichao2 WU Dong1.Study on Integrated Multi-objective Optimization of TBM Construction Method Based on the Improved Lightning Search Algorithm[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 156-164
[15] LIU Quanwei1,2 YANG Xing3 YE Shoujie1,2 JIANG Yusheng3 ZHAO Jizeng1,2 TAN Zhuolin4 YANG Zhiyong3.Study on Backfill Grouting Behind the Segment of Double Shield TBM Metro Tunnel Crossing Water-bearing Fault Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 255-261
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY