Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2024, Vol. 61 Issue (2) :254-262    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Key Technologies for Design and Construction of Horseshoe-Shaped Shield Used in Baicheng Tunnel on Menghua Railway
(1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2. China Railway No.4 Engineering Group Co., Ltd., Hefei 230023)
Download: PDF (5551KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The Baicheng Tunnel on the Menghua Railway, as the world's first large-section mountain loess tunnel constructed with a horseshoe-shaped earth pressure balance shield machine, faces key engineering challenges in launching and receiving, excavation, posture control, and muck removal, etc. In view of this, specific solutions are proposed: (1) For the launching section, the C40 opencut structure is used instead of the conventional shield launching reaction frame used in subways to provide reaction force, the large pipe shed is used for end reinforcement instead of conventional end reinforcement, and steel arch casing and sealing is used instead of end wall and curtain rubber sealing to shorten the launching time and save masonry works. (2) For the receiving section, a splayed retaining wall is constructed at the portal to replace the conventional enclosure structure and reinforcement works in subway engineering, and a steel ring is set up and sealed at the portal to ensure the safe receiving of the shield. (3) The combined rotary cutter head + the high-pressure water jet device for blind area treatment + shield cutters solve the excavation problem in the old loess stratum. (4) The cutter head overturn correction combined with the mortar pumping and counterweight block can solve the problem of posture control. (5) The muck conditioning technology using foam and water with 3% original solution concentration and 15% injection rate as the main improvement medium and the uninterrupted muck removal technology with optimized continuous belt conveyor improve the muck removal problem.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SHEN Zhijun1
2 YAO Zhiwen1 ZHENG Yuchao1 QIU Wenge1 AI Xufeng1
KeywordsMenghua Railway   Baicheng Tunnel   Horseshoe-shaped shield   Design   Construction technology     
Abstract: The Baicheng Tunnel on the Menghua Railway, as the world's first large-section mountain loess tunnel constructed with a horseshoe-shaped earth pressure balance shield machine, faces key engineering challenges in launching and receiving, excavation, posture control, and muck removal, etc. In view of this, specific solutions are proposed: (1) For the launching section, the C40 opencut structure is used instead of the conventional shield launching reaction frame used in subways to provide reaction force, the large pipe shed is used for end reinforcement instead of conventional end reinforcement, and steel arch casing and sealing is used instead of end wall and curtain rubber sealing to shorten the launching time and save masonry works. (2) For the receiving section, a splayed retaining wall is constructed at the portal to replace the conventional enclosure structure and reinforcement works in subway engineering, and a steel ring is set up and sealed at the portal to ensure the safe receiving of the shield. (3) The combined rotary cutter head + the high-pressure water jet device for blind area treatment + shield cutters solve the excavation problem in the old loess stratum. (4) The cutter head overturn correction combined with the mortar pumping and counterweight block can solve the problem of posture control. (5) The muck conditioning technology using foam and water with 3% original solution concentration and 15% injection rate as the main improvement medium and the uninterrupted muck removal technology with optimized continuous belt conveyor improve the muck removal problem.
KeywordsMenghua Railway,   Baicheng Tunnel,   Horseshoe-shaped shield,   Design,   Construction technology     
Cite this article:   
SHEN Zhijun1, 2 YAO Zhiwen1 ZHENG Yuchao1 QIU Wenge1 AI Xufeng1 .Key Technologies for Design and Construction of Horseshoe-Shaped Shield Used in Baicheng Tunnel on Menghua Railway[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(2): 254-262
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2024/V61/I2/254
 
No references of article
[1] ZHONG Wulin1 HAN Xingbo1 YE Fei1 WANG Han1 CAO Xiaoyong2 XI Weizheng2.Research on Wind Resistance and Optimization Design of Steel Corrugated Plate Support for Tunnel Shafts[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 197-207
[2] LIU Liying1 WEI Lixin1 YU Zhiyuan2 YANG Xudong3 YE Tingting1.Key Construction Technologies for the Ruyifang Immersed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 259-272
[3] LI Qiang1 HAN Xingbo2 XIE Ju1 LI Chao3 LI Xing3 MA Aihua1 BI Jiefu3 YE Fei.Tunnel Energy Supply Strategy and Practice with Grid-Connected PV-Storage Microgrid: A Case Study of the Wudingguan Tunnel Photovoltaic Power Station Project[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 60-66
[4] ZHENG Tengyue1 WANG Shuying1,2 YUAN Xiao1.Optimization of Construction Parameters for Shield Tunnels Undercrossing Existing Lines Based on Numerical Simulation and Machine Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 100-107
[5] WANG Zhilong1,2,3,4 WANG Mingnian2,3,4 ZHANG Xiao2,3,4 TONG Jianjun2,3,4 LIU Dagang2,3,4.Study on Mechanical Behaviors and Spatiotemporal Effects in Mechanized Large-section Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 229-239
[6] YAO Zhixiong1,2 HE Jiawei1 ZHENG Guowen3 ZHOU Qichuang1 SHI Linxin1 GAO Xiaoming4 YANG Yawei4.Analysis of the Load Bearing Mechanism and Mechanical Properties of the Advanced Pipe Roof and Discussion on Its Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 60-70
[7] ZHANG Xinyang1, 2 SHEN Yusheng1, 2 CHANG Mingyu1, 2 WANG Haokang1, 2 PAN Xiaohai1, 2 WANG Yanyan1, 2.Mix Proportion Design of Similar Materials for Tunnel Surrounding Rocks Based on GA-BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 82-91
[8] ZHOU Song1 PAN Yue1,2 LIU Yongsheng1,2 XIE Tao1.Mechanical Behavior Analysis and Construction Optimization for Inclined Shaft Transitioning to Main Tunnel in Extreme-highly Stressed and Fractured Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 142-150
[9] ZHOU Xiaojun.On Segmenting Design Method of Prefabricated Assembled Secondary Lining for High-speed Railway Tunnels Based on Cross-section Geometric Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 232-243
[10] XU Peng1 MA Zhenshuo1 WU Yimin2 WANG Zijian2 LIANG Weiming2.Discussion on Operation Ventilation Design for the Super-long Subsea Tunnel of the Bohai Strait Channel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 45-52
[11] YU Yu QI Chun YANG Jianmin LUO Lusen.Progress and Prospect of Loess Tunnel Construction Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 80-89
[12] ZHU Hehua1,2 LING Jiaxin1 ZHU Mengqi1 LI Xiaojun1,2 WU Wei1,2.Intelligent Construction for Drill-and-Blast Tunnels: Latest Technologies and Future Prospects[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 18-27
[13] ZHAO Yong1 WANG Mingnian2,3 YU Li2,3 ZHANG Xiao2,3.Development and Prospect of Tunnel Support Structure Design Theory and Method in China[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 28-42
[14] LI Yuwen WEI Yanqing.Key Technologies for Design and Construction of the Daliangshan No.1 Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 232-240
[15] YANG Chunshan1 YANG Xueqiang2 WANG Yatian2 LIN Yonggui1.Optimization of the Design and Construction Scheme of Tunnel Entry and Conver? sion System for Removal of Anti-slide Pile in Architecturally Sensitive Area[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 220-227
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY